Laserfiche WebLink
ATTY/RESO.0034/CC RESO APPROVING PROJECT (901 EL CAMINO REAL) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 26 of 28 <br />ATTACHMENT 1 TO 901 EL CAMINO REAL CONDITIONS OF APPROVAL <br />MITIGATION MEASURES <br /> <br />As stated in condition no. 106 and 107 above, Downtown CEQA Mitigation Measures, the <br />Project is required to implement and comply with all of the environmental mitigation <br />measures listed below. <br /> <br />DTPP Plan-Wide Amendments SEIR <br /> <br />The following list includes DTPP Plan-Wide Amendments SEIR mitigation measures that <br />are applicable to 901 El Camino Real. The DTPP Plan-Wide Amendments Mitigation <br />Monitoring and Reporting Program is included in Resolution No. 16153 and can be found <br />here: https://webapps.redwoodcity.org/files/cd/Gatekeeper/DTPP-Plan-Wide- <br />Amendments-SEIR-MMRP.pdf <br /> <br />• Mitigation Measure AE-5: Shadow Study for Exceptions to Building Placement <br />and/or Building Height and Disposition Regulations <br />• Mitigation Measure CR-2 (formerly Mitigation Measure 7-4: Impacts of <br />Development on Properties Adjacent to Historic Resources from the DTPP Final <br />EIR, with clarifying amendments) <br />• Mitigation Measure CR-3 (formerly Mitigation Measure 7-1: Impacts on <br />Archaeological Resources from the DTPP Final EIR, with clarifying amendments) <br />• Mitigation Measure UT-1a: Emergency Water Storage <br />• Mitigation Measure UT-1b: Water System Upgrades <br />• Mitigation Measure UT-1c: Sanitary Sewer System Upgrades <br />• Mitigation Measure UT-1d: Stormwater System Upgrades <br />• Mitigation Measure UT-2: Recycled Water Infrastructure <br />• Mitigation Measure UT-8 [Realignment and Alteration of Arroyo Ojo] <br />• Mitigation Measure NO-1: Construction Noise Reduction (formerly Mitigation <br />Measure 11-4: Temporary Construction Noise Impacts from the DTPP Final EIR, <br />with clarifying amendments) <br />• Mitigation Measure NO-2: Operational Noise Performance Standard <br />• Mitigation Measure NO-3: Vibration Reduction (formerly Mitigation Measure 11-3: <br />DPP- Related Temporary Construction Ground-Borne Vibration Impacts from the <br />DTPP Final EIR, with clarifying edits) <br />• Mitigation Measure AQ-2a: Best Management Practices for Construction Dust <br />Suppression <br />• Mitigation Measure AQ-2b: Emission Reduction Measures for Projects Exceeding <br />the Significance Thresholds for Criteria Pollutants.