My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16301
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 4:12:53 PM
Creation date
4/29/2025 4:10:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
4/28/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/29/2025 4:12 PM
Modified:
4/29/2025 4:12 PM
Text:
https://webapps.redwoodcity.org/files/cd/Gatekeeper/DTPP-Plan-Wide-Amendments-SEIR-MMRP.pdf
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/29/2025 4:12 PM
Modified:
4/29/2025 4:12 PM
Text:
https://webapps.redwoodcity.org/files/cd/Gatekeeper/DTPP-Plan-Wide-Amendments-SEIR-MMRP.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0034/CC RESO APPROVING PROJECT (901 EL CAMINO REAL) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 26 of 28 <br />ATTACHMENT 1 TO 901 EL CAMINO REAL CONDITIONS OF APPROVAL <br />MITIGATION MEASURES <br /> <br />As stated in condition no. 106 and 107 above, Downtown CEQA Mitigation Measures, the <br />Project is required to implement and comply with all of the environmental mitigation <br />measures listed below. <br /> <br />DTPP Plan-Wide Amendments SEIR <br /> <br />The following list includes DTPP Plan-Wide Amendments SEIR mitigation measures that <br />are applicable to 901 El Camino Real. The DTPP Plan-Wide Amendments Mitigation <br />Monitoring and Reporting Program is included in Resolution No. 16153 and can be found <br />here: https://webapps.redwoodcity.org/files/cd/Gatekeeper/DTPP-Plan-Wide- <br />Amendments-SEIR-MMRP.pdf <br /> <br />• Mitigation Measure AE-5: Shadow Study for Exceptions to Building Placement <br />and/or Building Height and Disposition Regulations <br />• Mitigation Measure CR-2 (formerly Mitigation Measure 7-4: Impacts of <br />Development on Properties Adjacent to Historic Resources from the DTPP Final <br />EIR, with clarifying amendments) <br />• Mitigation Measure CR-3 (formerly Mitigation Measure 7-1: Impacts on <br />Archaeological Resources from the DTPP Final EIR, with clarifying amendments) <br />• Mitigation Measure UT-1a: Emergency Water Storage <br />• Mitigation Measure UT-1b: Water System Upgrades <br />• Mitigation Measure UT-1c: Sanitary Sewer System Upgrades <br />• Mitigation Measure UT-1d: Stormwater System Upgrades <br />• Mitigation Measure UT-2: Recycled Water Infrastructure <br />• Mitigation Measure UT-8 [Realignment and Alteration of Arroyo Ojo] <br />• Mitigation Measure NO-1: Construction Noise Reduction (formerly Mitigation <br />Measure 11-4: Temporary Construction Noise Impacts from the DTPP Final EIR, <br />with clarifying amendments) <br />• Mitigation Measure NO-2: Operational Noise Performance Standard <br />• Mitigation Measure NO-3: Vibration Reduction (formerly Mitigation Measure 11-3: <br />DPP- Related Temporary Construction Ground-Borne Vibration Impacts from the <br />DTPP Final EIR, with clarifying edits) <br />• Mitigation Measure AQ-2a: Best Management Practices for Construction Dust <br />Suppression <br />• Mitigation Measure AQ-2b: Emission Reduction Measures for Projects Exceeding <br />the Significance Thresholds for Criteria Pollutants.
The URL can be used to link to this page
Your browser does not support the video tag.