Laserfiche WebLink
ATTY/RESO.0034/CC RESO APPROVING PROJECT (901 EL CAMINO REAL) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 27 of 28 <br />• Mitigation Measure AQ-3a: Emission Reduction Measures for Subsequent <br />Projects Exceeding the Significance Thresholds for Health Risks from <br />Construction <br />• Mitigation Measure AQ-3b: Laboratory Emission Controls <br />• Mitigation Measure AQ-3c: Design for Diesel Delivery Truck Emissions <br />Minimization <br />• Mitigation Measure CC-1: Enforce No Natural Gas Requirement and Require <br />Compliance with EV Requirements in CALGREEN Tier 2 <br />• Mitigation Measure BIO-1a (formerly Mitigation Measure 15-1(a): Special-Status <br />Species and Sensitive Natural Communities Impacts from the DTPP Final EIR) <br />• Mitigation Measure BIO-1b (formerly Mitigation Measure 15-3: Wildlife Movement <br />and Migratory Wildlife Impacts from the DTPP Final EIR) <br />• Mitigation Measure BIO-2a (formerly Mitigation Measure 15-1(b): Impacts on <br />Special-Status Species and Sensitive Natural Communities from the DTPP Final <br />EIR, with clarifying amendments) <br />• Mitigation Measure BIO-2b (formerly Mitigation Measure 15-2: Jurisdictional <br />Wetland Impacts from the DTPP Final EIR, with clarifying amendments) <br />• Mitigation Measure BIO-5 (formerly Mitigation Measure 15-4: Potential Loss of <br />Heritage Trees from the DTPP Final EIR) <br />• Mitigation Measure GEO-2 (formerly Mitigation Measure 16-3: Soil Erosion and <br />Sedimentation from the DTPP Final EIR, with clarifying amendments) <br />• Mitigation Measure GEO-4a (formerly Mitigation Measure 16-1: Expansive Soils <br />Impacts from the DTPP Final EIR, with clarifying amendments) <br />• Mitigation Measure GEO-4b (formerly Mitigation Measure 16-2: Corrosive Soils <br />Impacts from the DTPP Final EIR, with clarifying amendments) <br />• Mitigation Measure GEO-6 (formerly Mitigation Measure 7-5: Impacts on <br />Paleontological Resources from the DTPP Final EIR, with clarifying amendments) <br />DTPP EIR <br /> <br />The following list includes DTPP EIR mitigation measures that are applicable to 901 El <br />Camino Real. The DTPP EIR Mitigation Monitoring and Reporting Program is included in <br />Resolution No. 15086 and can be found here: Downtown_Precise_PlanMMRP-2011- <br />Attachment_to_Certifyin_Reso.pdf <br /> <br />• Mitigation Measure 7-1: Impacts on Archaeological Resources (superseded by <br />SEIR MM CR-3) <br />• Mitigation Measure 7-3: Impacts on Historic Districts <br />• Mitigation Measure 7-4: Impacts of Development on Properties Adjacent to Historic <br />Resources (superseded by Mitigation Measure CR-2) <br />• Mitigation Measure 7-5: Impacts on Paleontological Resources (superseded by <br />SEIR MM GEO-6)