Laserfiche WebLink
ATTY/RESO.0034/CC RESO APPROVING PROJECT (901 EL CAMINO REAL) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 28 of 28 <br />• Mitigation Measure 11-3: DPP-Related Temporary Construction Ground-Borne <br />Vibration Impacts (superseded by SEIR MM NO-3: Vibration Reduction) <br />• Mitigation Measure 11-4: Temporary Construction Noise Impacts (superseded by <br />SEIR MM NO-1) <br />• Mitigation Measure 12-1: Toxic Air Contaminant and PM2.5 Exposure Impacts <br />(superseded by SEIR MM AQ-3a) <br />• Mitigation Measure 15-1: Impacts on Special-Status Species and Sensitive Natural <br />Communities (superseded by SEIR MM BIO-1a) <br />• Mitigation Measure 15-2: Jurisdictional Wetland Impacts (superseded by SEIR MM <br />BIO-2b) <br />• Mitigation Measure 15-3: Wildlife Movement and Migratory Wildlife Impacts <br />(superseded by SEIR MM BIO-1b) <br />• Mitigation Measure 15-4: Potential Loss of Heritage Trees (superseded by SEIR <br />MM BIO- 5) <br />• Mitigation Measure 16-1: Expansive Soils Impacts (superseded by SEIR MM GEO- <br />4a) <br />• Mitigation Measure 16-2: Corrosive Soils Impacts (superseded by SEIR MM GEO- <br />4b) <br />• Mitigation Measure 16-3: Soil Erosion and Sedimentation (superseded by SEIR <br />MM GEO- 2) <br /> <br />