My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Woodard & Curran Amendment No. 2
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 Woodard & Curran Amendment No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2025 1:53:17 PM
Creation date
5/23/2025 1:53:14 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Comprehensive Sanitary Sewer Master Plan
Date
4/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-04-25 LR <br />a cost estimate for repair depending on the presumed extent of the concern. The approach <br />will be determined by the quality of the testing data and the specific force main configuration. <br />The assessment results from all thirty-one force mains (Redwood Shores and Seaport/Pacific <br />Shores) will be included in one Force Main Inspection Plan, but the effort to complete the Plan <br />will be separated by Subtask. <br />Subtask 14.2 – Force Main Desktop Study (for 5 Seaport/Pacific Shores force mains) <br />See Subtask 14.1 for scope, assumptions and deliverables. <br />SCHEDULE <br />The anticipated duration of the work under this Scope of Services is 6 months after receiving <br />Notice to Proceed. City will provide review comments within three (3) weeks after submittal of <br />draft deliverables. <br />ATTY/AGR.2025/Amend. No. 2/Woodard and Curran (Page 11 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.