Laserfiche WebLink
REV: 04-04-25 LR <br />a cost estimate for repair depending on the presumed extent of the concern. The approach <br />will be determined by the quality of the testing data and the specific force main configuration. <br />The assessment results from all thirty-one force mains (Redwood Shores and Seaport/Pacific <br />Shores) will be included in one Force Main Inspection Plan, but the effort to complete the Plan <br />will be separated by Subtask. <br />Subtask 14.2 – Force Main Desktop Study (for 5 Seaport/Pacific Shores force mains) <br />See Subtask 14.1 for scope, assumptions and deliverables. <br />SCHEDULE <br />The anticipated duration of the work under this Scope of Services is 6 months after receiving <br />Notice to Proceed. City will provide review comments within three (3) weeks after submittal of <br />draft deliverables. <br />ATTY/AGR.2025/Amend. No. 2/Woodard and Curran (Page 11 of 13)