My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.06.09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.06.09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 4:34:20 PM
Creation date
6/10/2025 4:28:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
6/9/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
6/10/2025 4:34 PM
Modified:
6/10/2025 4:34 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 5 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />By letter and email, dated May 2, 2025, and by certified mail sent on May 5, 2025, staff notified JMB <br />Construction, Inc. of staff’s intent to recommend that the City Council reject JMB Construction, Inc.’s bid <br />as non-responsible and award the project to the second lowest responsible and responsive bid. <br />Staff recommend awarding the contract to Subterra Construction, Inc., who had the second responsive <br />and responsible low bid of $4,375,600. <br />Construction is anticipated to begin in July 2025 and conclude in December 2025. Prior to the construction <br />start date, notification of the proposed work will be mailed to residents and property owners in the <br />vicinity. The contractor is required to distribute a two-week notice and an additional 48-hour notice in <br />advance of the start of work in their immediate area. Construction progress updates will be available on <br />the City’s website. <br />FISCAL IMPACT <br />There is no General Fund impact associated with this contract. Funds for Veterans Boulevard Sanitary <br />Sewer Replacement Project – Phase 3 were appropriated in the Fiscal Year 2024-25 budget for Sewer Fund <br />Capital Projects – Collection System Replacement Program. The fund has an available balance of <br />$6,861,000 as of May 13, 2025. <br />Table 2: Construction Budget <br />Construction subtotal $4,375,600 <br />Contingency (10%)$437,560 <br />Construction Administration $189,000 <br />Total construction cost $5,002,160 <br />Estimated available funding $6,861,000 <br />Construction Administration fees are estimated at $189,000 and are included within the program’s <br />estimated available funding. These fees cover Engineering and Transportation staff time for construction <br />management and on-call consultant services for inspection and geotechnical field testing, which are <br />essential to keeping the project on schedule and within the dedicated construction budget. <br />ENVIRONMENTAL REVIEW <br />The Veterans Boulevard Sanitary Sewer Replacement Project – Phase 3 qualifies as a Class 2 categorical <br />exemption under the California Environmental Quality Act (CEQA) Guidelines Section 15302(c) because it <br />involves replacement or reconstruction of an existing utility system or facilities involving negligible or no <br />expansion of capacity. Furthermore, the project design complies with the City’s Engineering Standards <br />and currently accepted practices. A Notice of Exemption (NOE) will be filed pending Council approval. <br />6.F. - Page 4 of 5 <br />62
The URL can be used to link to this page
Your browser does not support the video tag.