My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.06.09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.06.09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 4:34:20 PM
Creation date
6/10/2025 4:28:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
6/9/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
6/10/2025 4:34 PM
Modified:
6/10/2025 4:34 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 of 5 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />Figure 1: Project Location Map <br />ANALYSIS <br />On April 23, 2025, the bid opening for the Veterans Boulevard Sanitary Sewer Replacement Project – <br />Phase 3 was held virtually. Six bids were received by the deadline of April 23, 2025. The bid amounts are <br />summarized in Table 1 – Summary of Bid Results, below. <br />Table 1: Summary of Bid Results <br />Bidder <br />(Lowest to highest) <br />Total Bid Amount <br />(As bid) <br />JMB Construction, Inc.$4,261,570 <br />SubTerra Construction, Inc.$4,375,600 <br />Ranger Pipelines, Inc.$4,588,880 <br />Cratus, Inc.$4,754,300 <br />Con-Quest Contractors, Inc.$5,334,045 <br />K.J. Woods Construction, Inc.$6,438,000 <br />Engineer’s Estimate $4,500,000 <br />Engineering and Transportation Department staff determined the low bid of $4,261,570 submitted by <br />JMB Construction, Inc., was non-responsible. The bid package submitted by JMB Construction, Inc. <br />showed an Interstate Experience Modification Rate (EMR) of 1.21. Section 00 4513 of the Project Manual’s <br />Attachment A – Statement of Qualification Questionnaire states that “[a] rating in excess of [1] may <br />constitute grounds for disqualification as non-responsible”. A higher EMR indicates a company received <br />more workers’ compensation claims than expected. The decision to reject JMB Construction, Inc. as non- <br />responsible is permitted under Section 00 2113 of the Project Manual’s Instruction to Bidders, item 3.01 <br />Part D, which provides in relevant part: <br />“If Apparent Low Bidder is determined to be non-responsive or non-responsible, then City may <br />proceed to the next Apparent Low Bidder’s Bid pursuant to any procedures determined in its <br />reasonable discretion, and proceed for all purposes as if this Apparent Low Bidder were the <br />original Apparent Low Bidder.” <br />6.F. - Page 3 of 5 <br />61
The URL can be used to link to this page
Your browser does not support the video tag.