Laserfiche WebLink
Page 2 of 5 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />In March 2023, Public Works Services Department staff noticed cracks along the road surface at the <br />intersection of Veterans Boulevard and Chestnut Street, indicating damage to the 33-inch south sewer <br />main. A closed-circuit television condition assessment confirmed both the north and south sanitary sewer <br />lines were in failing condition. <br />The City Manager was notified of the damage on April 3, 2023 and authorized emergency permanent <br />repairs of both sewer segments underneath the Union Pacific Railroad tracks. Engineering and <br />Transportation Department staff developed a phased replacement plan for the two large diameter <br />sanitary sewer lines. <br />Phase 1 of the emergency repairs began on March 26, 2024. Phase 1 replaced 384 feet of the north and <br />94 feet of the south sewer main segments between the Union Pacific Railroad tracks and Chestnut Street. <br />On October 28, 2024, the City Council accepted Phase 1 of the Emergency Veterans Sanitary Sewer Repairs <br />and Replacement Project. <br />As Phase 1 neared completion, more sinkholes were discovered downstream along the north sanitary <br />sewer main between Chestnut Street and Hansen Way. Because repairs on the north sanitary sewer main <br />were not in the proposed scope of work for Phase 2, Engineering and Transportation staff requested and <br />received the City Manager’s authority for additional emergency sewer line repair along the north main. <br />This additional work, titled the supplemental 2024 Emergency Veterans Boulevard Sewer Replacement <br />Project, was added to the proposed scope of work for Phase 2. <br />Phase 2 of the Emergency Veterans Boulevard Sewer Main Repairs and Replacement Project replaced 570 <br />feet of the south sanitary sewer main on Veterans Boulevard from Chestnut Street to Hansen Way. The <br />supplemental 2024 Emergency Veterans Boulevard Sewer Replacement Project removed and replaced <br />315 feet of the existing north sanitary sewer main, slip-lined (a trenchless pipe repair involving inserting <br />a smaller diameter pipe into an existing, damaged pipe) 165 feet of existing sanitary sewer main and <br />installed 130 feet of a new 36-inch bypass main through Hansen Way connecting the north and south <br />mains. <br />Phase 3 will include the north and south sanitary sewer main segments on Veterans Boulevard between <br />Hansen Way and Walnut Street, as shown in Figure 1 – Project Location Map, below. The scope of work <br />will abandon the north main and upsize the parallel south main, merging the two into one larger sewer <br />main. Consolidating pipe flows into a single sewer main will streamline maintenance efforts. <br />6.F. - Page 2 of 5 <br />60