My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-12-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:09:37 PM
Creation date
12/10/2009 4:16:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/14/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1 F <br /> Page 4 <br /> Brian Lee,City of Redwood City „ <br /> Construction Support Scope <br /> November 17,2�09 <br /> Page 2 <br /> 3. Contract Close-Out <br /> This task includes reviewing the post-dredge survey and final quantity estimates prepared <br /> by the contractor, attending the final jobwalk meeting, reviewing final punch lists, and <br /> reviewing the inspeckor's Final Inspection Report. <br /> Fee&Schedule <br /> The estimated fee for the work is shown on the attached spreadsheet. M&N proposes to <br /> invoice for time and materials expended, on a mon#hly basis, based on our standard rate <br /> schedule as attached. <br /> This would be a request for Amendment 3 to our contract-dredging projects, particularly <br /> specialized projects such as lagoon dredging, are becoming increasingly difficult to imp(ement <br /> and permit due to the nature of the work. It is also very difficult to estimate design and <br /> engineering costs for such projects at the onset because a lot depends on sediment quality <br /> and disposal locations. Of interest is the fact that with the requested modification, our total <br /> contracted fee to date which includes preparing bid documents, coordinating sediment <br /> sampling, providing permit support, and providing construction support will total less than <br /> about$190,000. <br /> Thank you for the opportunit�l to offer our services on this project, and we look forward to <br /> contlnuing to support you and the City on this dredging project. Should you have any <br /> questions, please contact me or Jack Fink at your convenience <br /> Sincerely, <br /> MOFFATT&NICHOL <br /> . . <br /> _ � <br /> Dilip Trivedi, Dr.Eng., P.E. <br /> Principai/Project Manager <br /> D:lBtee Amend No.3 19-1 T-09.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.