6.1 F <br /> Page 4 <br /> Brian Lee,City of Redwood City „ <br /> Construction Support Scope <br /> November 17,2�09 <br /> Page 2 <br /> 3. Contract Close-Out <br /> This task includes reviewing the post-dredge survey and final quantity estimates prepared <br /> by the contractor, attending the final jobwalk meeting, reviewing final punch lists, and <br /> reviewing the inspeckor's Final Inspection Report. <br /> Fee&Schedule <br /> The estimated fee for the work is shown on the attached spreadsheet. M&N proposes to <br /> invoice for time and materials expended, on a mon#hly basis, based on our standard rate <br /> schedule as attached. <br /> This would be a request for Amendment 3 to our contract-dredging projects, particularly <br /> specialized projects such as lagoon dredging, are becoming increasingly difficult to imp(ement <br /> and permit due to the nature of the work. It is also very difficult to estimate design and <br /> engineering costs for such projects at the onset because a lot depends on sediment quality <br /> and disposal locations. Of interest is the fact that with the requested modification, our total <br /> contracted fee to date which includes preparing bid documents, coordinating sediment <br /> sampling, providing permit support, and providing construction support will total less than <br /> about$190,000. <br /> Thank you for the opportunit�l to offer our services on this project, and we look forward to <br /> contlnuing to support you and the City on this dredging project. Should you have any <br /> questions, please contact me or Jack Fink at your convenience <br /> Sincerely, <br /> MOFFATT&NICHOL <br /> . . <br /> _ � <br /> Dilip Trivedi, Dr.Eng., P.E. <br /> Principai/Project Manager <br /> D:lBtee Amend No.3 19-1 T-09.doc <br />