My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 2:00:33 PM
Creation date
6/27/2025 1:59:53 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TRAFFIC REGULATIONS 01 5500-4 <br />3.01 DIVERTING PEDESTRIAN TRAFFIC <br />A. Whenever construction operations obstruct the flow of pedestrian traffic or present <br />a hazard to pedestrians, the Contractor shall take appropriate action to protect and <br />separate pedestrians from the work area and to direct pedestrians to alternate <br />routes. <br />B. Requests to close a sidewalk in the middle of the block are generally not accepted <br />because this results in pedestrians having to walk around the work site, usually out <br />into the street, to continue down the sidewalk. <br />C. Such action may include placement of barricades between pedestrians and work <br />areas, placement of warning signs, and provision of personnel as required to <br />protect pedestrians as conditions warrant. Contractors may also route pedestrians <br />into the parking strip provided that a temporary walkway with adequate protection <br />is set up. <br />3.02 DIVERTING BICYCLE TRAFFIC <br />A. Whenever construction operations obstruct the flow of bicycle traffic or present a <br />hazard to bicyclists, the Contractor shall take appropriate action to protect <br />bicyclists and, if necessary, to direct bicyclists to alternate routes. <br />B. Contractor shall maintain all existing bike paths and bike lanes. <br />1. With the closure of any on off-street bike path, Contractor shall provide an <br />alternate route for bicyclists either by use of an alternate paved path or a <br />temporary bike lane on the street. <br />2. Any bike lane that is effectively narrowed below 5 feet is considered a bike <br />lane closure. Contractor shall provide additional bike signs such as <br />“Bicycles Allowed Use of Full Lane” or “Bicycle Route Detour” signs be <br />posted as part of the conditions of the permit. <br />C. If a designated bicycle route is affected during construction, the Contractor shall <br />post a ““Bicycles Allowed Use of Full Lane” (R4-11) sign at the beginning of the <br />block. <br />3.03 DIVERTING VEHICULAR TRAFFIC <br />A. Whenever construction operations obstruct the flow of vehicular traffic or present <br />a hazard to vehicles operating in the vicinity of construction operations, the <br />Contractor shall take appropriate action to warn, detour and otherwise protect <br />approaching drivers and vehicles. <br />3.04 TRAFFIC CONTROL DEVICES <br />A. General: <br />1. Provide traffic control devices in sufficient quantities and types as required to <br />provide safe and adequate traffic control.
The URL can be used to link to this page
Your browser does not support the video tag.