My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 2:00:33 PM
Creation date
6/27/2025 1:59:53 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TRAFFIC REGULATIONS 01 5500-5 <br />2. During hours of darkness approved lights shall be included, in proper working <br />order, to illuminate signs and hazards and alert approaching traffic. <br />3. Provide and maintain barricades along all open trenches in contact with <br />traffic. <br />4. No work may begin on any day or at any time before traffic control devices <br />have been placed, test driven and, if required, adjusted and revised. <br />B. Placement: <br />1. Place all traffic control devices in accordance with the Standard Plans and <br />Specifications, the CA MUTCD and approved Traffic Control Plan. <br />2. Adjust locations of devices to suit the conditions and circumstances of each <br />detour situation. In all cases, place signs to most effectively convey their <br />messages to approaching traffic. <br />3. The Contractor shall adjust and revise all traffic control devices if determined <br />to be required by the City Engineer or Police Department. <br />4. The Contractor shall provide additional traffic control devices if required to <br />maintain the safe flow of traffic through construction operation. <br />C. Maintenance of Devices: <br />1. The Contractor shall maintain all traffic control devices, at proper locations <br />and in proper working order, at all times during construction operations and <br />whenever a hazard resulting from Contractor's operations exists. <br />2. The Contractor shall adjust and revise traffic control devices, placement, etc., <br />to suit changing conditions around construction operations. <br />D. Removal of Devices: <br />1. Traffic control devices shall remain in place at all times required to alert <br />approaching traffic of upcoming hazards. <br />2. After hazard has been removed, remove all traffic control devices. Remove <br />signs or completely cover their messages. <br />3.05 FLAGGERS <br />A. General: The Contractor shall employ flaggers: <br />1. As required for each specific detour. <br />2. At all locations on a construction site where barricades and warning signs <br />cannot control the moving traffic. <br />B. Placement: Where flaggers are required, they shall be logically placed in relation <br />to the equipment or operation so as to give adequate warning and shall be placed
The URL can be used to link to this page
Your browser does not support the video tag.