Laserfiche WebLink
TRENCHING & BACKFILL 02 2020-4 <br />2. Thoroughly moisten surfaces as required to prevent dust being a nuisance <br />to the public, neighbors, and personnel performing other work on the site. <br />3. Use dust palliatives or reclaimed water (not potable water). <br />F. Maintain access to adjacent areas at all times. <br />G. Maintain and/or replace all bench marks, monuments, construction stakes and <br />other reference points. <br />H. Repair or restore damage to any portion of the work resulting from movement of <br />the sides or bottom of trenches or other excavation which is attributable to the <br />Contractor's acts or omissions, whether sides are braced or not. <br />PART 2 - PRODUCTS <br />2.01 GENERAL SOIL MATERIALS <br />A. In general, soils used for backfill shall be select material free of debris, roots, <br />wood, scrap material, vegetation, refuse, soft unsound particles, frozen, <br />deleterious, or objectionable materials, satisfactory to the Engineer, free of <br />stones or lumps exceeding 3 inches in greatest dimension. <br />2.02 PIPE BEDDING AND INITIAL BACKFILL MATERIAL <br />A. Pipe bedding and initial backfill up to six inches above the top of the pipe shall be <br />Class I, Type A, ¾” maximum size gradation permeable material, conforming to <br />Section 68-2.02F(2) of the State of California Department of Transportation <br />Standard Specifications. <br />B. Material shall contain at least 75% of the particles having one or more fractured <br />faces. <br />C. Bedding and backfill material shall be subject to the approval of the Engineer. <br />2.03 SELECT BACKFILL ABOVE INITIAL BACKFILL OR BEDDING <br />A. In non-paved areas unless otherwise shown on plans, select backfill shall <br />conform to the requirements for soil materials above, and shall be classified as <br />(GW), (GP), (GM), (SW), (SP) or (SM) by ASTM D 2487 and meet the following: <br />1. Sand equivalent shall not be less than 25 when tested in accordance with <br />ASTM D 2419, plasticity index shall not exceed 15 when tested in <br />accordance with ASTM D 424, and not more than 25% by weight shall be <br />finer than the No. 200 sieve. <br />2. On-site native material may be used as backfill if it conforms to 2.03A.1, <br />above. <br />B. In paved areas, except Bay Mud, select backfill shall be Class 2 aggregate base, <br />3/4" maximum size gradation conforming to Section 26-1.02B of the State of <br />California Standard Specifications.