My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 2:00:33 PM
Creation date
6/27/2025 1:59:53 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SANITARY SEWERS 02 7300-11 <br /> <br />C. Alignment: All pipe shall be accurately laid in conformity with the prescribed lines <br />and grades as established by the ENGINEER. Each length shall be jointed to the <br />preceding section as specified, and after said jointing has been completed, there <br />shall be no movement of the pipe in subsequent operations. <br />D. Pipe Deflections: The laying of pipe on curved alignment by means of un- <br />symmetrical closure of joints, will be permitted only when necessary to conform to <br />the alignment shown on the plans. Grade breaks indicated on the plans shall be <br />accomplished by un-symmetrical closure of pipe and NOT by means of fittings. <br />Joint deflections called for on the plans shall be permitted up to one-half of the <br />deflections recommended by the pipe manufacturer. <br />E. Cleaning: Before each new length of pipe is placed, the interior of the preceding <br />pipe shall be carefully cleaned of all dirt and debris. When pipe laying is not in <br />progress, all open pipe ends shall be satisfactorily closed with watertight plugs. <br />F. Bearing: Pipe in the trench shall have continuous uniform bearing along its bottom, <br />except at bell holes. Before lowering pipe into the trench, the CONTRACTOR shall <br />remove all stakes, debris, loose rock and other hard material from the bottom of <br />the trench. <br />G. Positioning: After the final positioning, pipe shall be held in place in the trench with <br />backfill material placed equally on both sides of the pipe at as many locations as <br />required to hold the pipe section in place. After joints are completed, the backfill <br />material shall be redistributed and compacted as herein required. <br />H. Closure: At the end of each day and when work is not in progress, all open ends <br />of pipe installed in the line shall be satisfactorily closed with watertight plugs. <br />I. Thrust Blocking for Force Mains: Concrete thrust blocks of the form and <br />dimensions shown or noted on the plans shall be provided at all changes in <br />horizontal and vertical alignments and at such other points as may be called for on <br />the plans. Thrust blocks shall be installed in strict conformance with the details <br />shown or noted on the plans. <br />J. Restrained Joint for Force Mains: Install per manufacturer’s instructions. Length of <br />restraint as shown on Drawings. Install Petrolatum Wax Tape System per Section <br />02 6610. <br />K. Tracer Wire for Force Mains: Install in trench along the pipe. Splice tracer wire in <br />accordance with manufacturer’s recommendations. Install locator balls at point of <br />connection for all laterals. <br />L. Use of Controlled Density Fill: At mainline trenches and lateral trenches with pipes <br />that are 30 inches deep or less as measured from the top of pipe to existing <br />pavement surface and at all areas where compaction is not possible shall be <br />backfilled with controlled density fill (CDF) in lieu of Class 2 aggregate base. Other <br />requirements shall conform to Section 02 2020 of these specifications <br />M. HDPE Pipe Installation: The CONTRACTOR shall remove the internal bead.
The URL can be used to link to this page
Your browser does not support the video tag.