My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 2:00:33 PM
Creation date
6/27/2025 1:59:53 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SANITARY SEWERS 02 7300-12 <br /> <br />3.02 CONNECTIONS <br />A. CONTRACTOR shall make all required connections to existing facilities and <br />improvements. <br />B. All connections in manholes shall be constructed with PVC half channel, where <br />possible or with concrete channels directed toward the outlet pipe as shown and <br />detailed on the plans. <br />C. All PVC and HDPE pipe entering or leaving a manhole shall have a rubber sealing <br />gasket as supplied by the pipe manufacturer, firmly seated perpendicular to the <br />pipe axis, around the pipe exterior and cast into the structure base or near the wall <br />center as a water stop. Water stop may also consist of a manhole coupling with <br />rubber sealing rings cast into the structure base. <br />D. Use PVC manhole adapters in cored-out holes in manholes for connecting new <br />PVC pipe and grout all around to prevent ground water infiltration. Pipes shall be <br />cut off flush with the inside surface of the manhole. <br />E. HDPE anchors or flex restraint device shall be installed after the pipe has been <br />installed and relaxed in the entire length of the sewer section. The pipe shall <br />protrude in the manholes for enough distance to allow sealing and trimming. <br />F. Precast manhole installation shall conform to Section 02 7350 of these <br />specifications. <br />G. Use 2-foot nominal lengths of PVC pipe when entering and leaving manholes and <br />structures. <br />H. All ends of sanitary sewers provided for future connection as directed be the CITY <br />shall be plugged with “Polycap” stoppers providing the same joint characteristics <br />as specified for the sanitary sewer main or lateral. <br />3.03 ABANDONMENT OF EXISTING SANITARY SEWER MAIN <br />A. CONTRACTOR shall submit proposed plans, methods and procedures for CITY <br />approval, regarding the abandonment of existing sanitary sewer main by concrete <br />slurry filling. It should show the pumping methods, pumping pits excavations <br />locations, concrete slurry filling methods, cutting and plugging of existing pipes, <br />pavement restoration and other applicable related work items. <br />B. Sanitary sewer main shall be CCTV for active laterals, coordinate with the CITY of <br />the results and reconnect all active laterals prior to concrete slurry fill. <br />C. Gravity sewer or force mains to be abandoned shall be plugged with mortar and <br />an eight inch (8”) thick concrete brick wall. The CONTRACTOR shall fully fill the <br />voids of the existing sanitary sewer main to be abandoned with the CITY approved <br />concrete slurry mix design.
The URL can be used to link to this page
Your browser does not support the video tag.