SANITARY SEWERS 02 7300-14 <br /> <br />A. The CONTRACTOR shall determine if the lateral is common/shared or active <br />prior to abandonment. CONTRACTOR shall be responsible for any additional <br />cost to reinstate the active lateral that is abandoned. <br />1. The downstream end of the lateral shall be sealed with a manufactured <br />watertight cap/stopper made specifically for the purpose of sealing/capping <br />the end of a sanitary sewer. The cap/stopper shall be installed per <br />manufacturer’s recommendation and in such a way to prevent any source of <br />water from entering the sanitary sewer system. Any device or material that <br />may slide into the lateral and potentially cause a blockage or obstruction in <br />the mainline sewer will not be allowed. The cap/stopper shall be installed on <br />a defect free portion of the lateral immediately before the wye connection to <br />the city main. If defects are found in the wye connection, the CONTRACTOR <br />shall excavate toward the main and the wye shall be removed and replaced <br />with a new portion of equally sized pipe. <br />2. The remaining portion of the lateral from the point of termination to structure <br />shall be sealed at both ends with a manufactured watertight cap/stopper <br />made specifically for the purpose of sealing/capping the end of a sanitary <br />sewer. The cap/stopper shall be installed on a defect free portion of the <br />lateral. If defects are found then the CONTRACTOR shall excavate the lateral <br />until a defect free portion of the lateral is located. <br />3. If at least one service from the common lateral is intended to remain, the <br />connecting fitting for the laterals shall be removed and replaced with a new <br />section of straight pipe or an elbow of sufficient angle to provide a smooth <br />transition between the existing portions of the lateral. Elbow shall be a <br />manufactured fitting and shall be installed per manufacturer’s <br />recommendation to assure a watertight seal. <br />3.06 CLEANING SANITARY SEWERS <br />A. The Project is ready for cleaning when the following work has been completed: <br />1. All sewer mains and laterals are rehabilitated/installed, backfilled, and <br />compacted. <br />2. All structures are in place, all channeling is complete, and pipelines are <br />accessible from structures. <br />3. All other underground facilities, utility piping, and conduits are installed. <br />4. Placement of aggregate base has been completed. <br />5. Final air test has been completed. <br />Acceptance of the cleaning shall be based upon the subsequent video inspection <br />of the line. <br />B. CONTRACTOR shall clean all sewer mains in accordance with Section 02 7310 <br />of these specifications by hydraulically flushing, means of pneumatic, and sewer