Laserfiche WebLink
Executive Summary <br />City of Redwood City (0011239.02)9 Woodard & Curran, Inc. <br />Sanitary Sewer Capacity Master Plan November 2023 <br />Table ES-2:Recommended Capacity Improvement Projects <br />Project <br />ID1 Location Length (lf.)Existing <br />Dia. (in.) <br />Proposed <br />Dia. (in.) <br />C22 Bradford St. (Jefferson Ave. to Main St.)540 24 36 <br />C32 Beech St., Stambaugh St., Walnut St. (Caltrain ROW to <br />Bradford St.)3,310 27 36 <br />C42 California St., Broadway St., Marshall St., Jefferson Ave. <br />(south of Winklebleck St. to Bradford St.)2,430 12/15/18 18/21/24 <br />C5 Jefferson Ave. (n/o Redwood Creek siphon and Broadway <br />St. to Marshall St.)590 10/12 12/18 <br />C6 Franklin St., Wilson St., Middlefield Rd., Jefferson Ave. <br />(Sequoia Station to s/o Redwood Creek siphon)1,990 6/8/10 10/12 <br />C72,3 Winslow St. (Standish St. to Brewster Ave.), Brewster Ave <br />(Winslow St. to west of Veterans Blvd.)1,430 156 18 (new <br />alignment) <br />C83 Whipple Ave. (Woodstock Pl. to Arguello St.)3,330 8 10 <br />C92,3 Brewster Ave. (Hudson St. to Arch St.)2,250 10 12/15 <br />C10 James Ave. (Jeter St. to Hudson St.)640 8/10 15 <br />C113 Jefferson Ave. (Myrtle St. to Iris St.)970 8 10 <br />C12 Vera Ave. (w/o King St. to Hudson St.)960 8 12 <br />C132 Lincoln Ave. (Hudson St. to El Camino Real)2,600 24 30/33 <br />C142,3 Roosevelt Ave. (Valota Rd. to Hudson St.)2,510 21 24 <br />C15 Roosevelt Ave. (Grand St. to Fulton St.)510 8 10 <br />C16 Maddux Dr., Washington Ave., Virginia Ave. (Kensington Rd. <br />to Goodwin Ave.)3,170 8/12 12/15 <br />C17 Hampton Ave., Sierra St., Palm Ave., Kentfield Ave. (Valota <br />Rd. to Palm Ave.1,760 6/8 12 <br />C182,3 Truman St., McGarvy Ave., Fairview Ave., Roosevelt Ave. <br />(southeast of McGarvy Ave. to Roosevelt Ave.)1,210 12 15 <br />C193 Carson St. (Dewey St. to southeast of Roosevelt Ave.)820 8 10 <br />C20 Glenwood Ave., Canyon Rd., Jefferson Ave. (Breeze Pl. to <br />Oak Ridge Dr.)1,210 8 12/15 <br />C21 Vista Dr. (Hamilton Way to Toyon Way)300 6 10 <br />C223 Jefferson Ave. (Ruby St. to Quartz St.)310 6 8 <br />C23 Madison Ave. (Topaz St. to Ruby St.)580 12 15 <br />C24 Myrtle St. (northwest of Harrison Ave.)320 6 8 <br />C25 Broadway St. (El Camino Real to California St.)490 6 8 <br />C264 Davit Ln. (Keelson Cir. to PS10)520 8 12 <br />C275 Sanitary Sewer Pump Station No. 9 Improvements 724 4 6 <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 98 of 317