My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16341
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16341
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 1:50:17 PM
Creation date
7/22/2025 1:47:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
7/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GOAL AND INTRODUCTION <br /> <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Redwood City use only Page 10 of 59 <br />Specifications 5.2 – SSMP Development and Implementation <br />WDR REQUIREMENTS <br />Specification. 5.2 (pg. 18) <br />“To facilitate adequate local funding and management of its sanitary sewer system(s), the Enrollee shall <br />develop and implement an updated Sewer System Management Plan. The scale and complexity of the <br />Sewer System Management Plan, and specific elements of the Plan, must match the size, scale, and <br />complexity of the Enrollee’s sanitary sewer system(s). The Sewer System Management Plan must <br />address, at minimum, the required Plan elements in Attachment D (Sewer System Management Plan – <br />Required Elements) of this General Order. To be effective, the Sewer System Management Plan must <br />include procedures for the management, operation, and maintenance of the sanitary sewer system(s). <br />The procedures must: (1) incorporate the prioritization of system repairs and maintenance to proactively <br />prevent spills, and (2) address the implementation of current standard industry practices through <br />available equipment, technologies, and strategies.” <br />COMPLIANCE <br />This SSMP has been completed and updated to meet the requirements of the WDR and address all required <br />Elements and Specifications required by the Order. The SSMP addresses management, operations and <br />maintenance procedures specific to the City’s collection system. The City maintains a proactive O&M <br />program to operate its system and identify defects, which are then prioritized for repair, replacement, <br />rehabilitation, or placed on modified maintenance schedules. (See Elements 4 and 8 and Specifications 5.19 <br />of this SSMP for more detail). <br />The City keeps up with current industry standards, technology and best practices by reviewing industry <br />periodicals, networking with neighboring agencies, interacting with vendors, and attending the local Santa <br />Clara CWEA meetings. The Agency continuously evaluates emerging practices, equipment and technologies <br />for possible implementation to enhance sewer operations. <br /> <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 17 of 317
The URL can be used to link to this page
Your browser does not support the video tag.