My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16341
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16341
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 1:50:17 PM
Creation date
7/22/2025 1:47:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
7/21/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/22/2025 1:50 PM
Modified:
7/22/2025 1:50 PM
Text:
https://www.waterboards.ca.gov/board_decisions/adopted_orders/water_quality/2022/wqo_2022-0103-dwq.pdf
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/22/2025 1:50 PM
Modified:
7/22/2025 1:50 PM
Text:
https://www.redwoodcity.org/home/showpublisheddocument/27653/638447131887230000
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DESIGN AND PERFORMANCE PROVISIONS <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Redwood City use only Page 37 of 59 <br />5.2. Procedures and Standards <br />WDR REQUIREMENTS <br />Attachment D-5.2 (pg. D-5) <br />“Procedures, and standards for the inspection and testing of newly constructed, newly installed, <br />repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.” <br />COMPLIANCE <br />The City’s Engineering Standards, Volume 1, Section 027300, Part 3.08 - Testing Sanitary Sewers, provides <br />the procedures and standards for inspection and testing requirements for newly constructed and <br />rehabilitated sewer facilities. <br />EFFECTIVENESS <br />The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element: <br />• Were any design or installation deficiencies found during acceptance inspections? <br />• Are deviations from standard procedures and/or specs, testing, etc., justified and documented? <br />• Does the City stay abreast of industry design standards and technical advances in the industry? <br />IMPLEMENTATION PLAN/SCHEDULE <br />No. Plan Schedule Responsible Party <br /> E&T PWS <br />5.2.1 Verify inspection procedures are adequate and <br />consistent with current standards of practice Each Project X <br />5.2.2 Verify design standards and hydraulic model <br />previously completed are adequate and <br />consistent with current standards of practice. <br />Each Project X <br />RESILIENCE <br />Resilience is addressed in Element 5 by: <br />• Staying abreast of industry trends and standards. <br />• Performing acceptance inspections of newly installed or repaired assets to evaluate design and <br />installation practices. <br />• Evaluating as-built changes for trends and areas for design and performance improvements. <br />• Monitoring performance of newly installed or repaired assets. <br />APPENDIX 5 INCLUSIONS: <br />• None <br /> <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 44 of 317
The URL can be used to link to this page
Your browser does not support the video tag.