Laserfiche WebLink
DESIGN AND PERFORMANCE PROVISIONS <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Redwood City use only Page 36 of 59 <br />5. Design and Performance Provisions <br />5.1. Updated Design Criteria/Construction Standards/Specifications <br />WDR REQUIREMENTS <br />Attachment D-5.1 (pg. D-5) <br />“Updated design criteria, and construction standards and specifications, for the construction, <br />installation, repair, and rehabilitation of existing and proposed system infrastructure components, <br />including but not limited to pipelines, pump stations, and other system appurtenances. If existing design <br />criteria and construction standards are deficient to address the necessary component-specific hydraulic <br />capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of <br />this Attachment, the procedures must include component-specific evaluation of the design criteria.” <br />COMPLIANCE <br />The City’s Engineering Standards were first adopted in 2003 and most recently updated in 2024. <br />Contractors are required to comply, at a minimum, with the Engineering Standards. <br />Volume I- Standard Technical Specifications provides direction for sewer construction, specifications for <br />earthwork, pipe work, manholes, materials, and reinforcement. For example, Section 02 2020 contains <br />specifications for trenching, backfill, pipe bedding and cover material. Section 02730, Part 2.01 contains <br />specifications for pipe material, sizes, and grades. Section 02 7300, Part 2.03 contains specifications for <br />manholes. Section 02 5500 contains specifications for reinforcement and Section 02 7300; Part 3.08 <br />contains specifications for testing of sanitary sewers. <br />Volume II- Standard Details includes the technical drawings associated with the construction of public <br />improvements. <br />Volume III- Design Criteria includes general planning requirements, survey and grading criteria, and sanitary <br />sewer system design criteria for both public and private improvements. <br />EFFECTIVENESS <br />The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element: <br />• Are plan checking QA/QC processes helping to ensure adherence to the standards? <br />IMPLEMENTATION PLAN/SCHEDULE <br />No. Plan Schedule Responsible Party <br /> E&T PWS <br />5.1.1 Ensure all project plans are approved in accordance <br />with the City’s Standard Specifications and Details. Each Project X <br />5.1.2 <br />Verify that design standards and hydraulic model <br />previously completed are adequate and consistent <br />with current standards of practice. <br />Each Project X <br /> <br /> <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 43 of 317