My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16341
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16341
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 1:50:17 PM
Creation date
7/22/2025 1:47:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
7/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Redwood City use only Page 47 of 59 <br />The 2023 Sanitary Sewer Capacity Master Plan considered dry weather peak flow conditions, as well as <br />updated design storm and wet weather events and future development. <br />Pump Stations were evaluated and are designed to ensure sufficient firm capacity for design storm peak <br />wet weather flows. Except for one pump station, all pump stations have two pumps. <br />EFFECTIVENESS <br />The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element: <br />• Number of capacity-related spills or surcharge condition during the audit period. <br />• Has the system responded to rain events as indicated by the hydraulic model? <br />• Has there been any changes to zoning designations (residential, commercial, industrial)? <br />IMPLEMENTATION PLAN/SCHEDULE <br />No Plan Schedule Responsible Party <br /> E&T PWS <br />8.2.1 Monitor/evaluate significant rain <br />events to see if they exceed the <br />design storm in the hydraulic model. <br />Each significant rain evet <br />X <br />8.2.2 Identify and monitor flood-prone <br />areas susceptible to erosion from <br />rain events <br />After each significant rain event <br />X X <br />8.2.3 Monitor flows in each basin and <br />update the hydraulic model <br />Per Engineering Department <br />schedule X <br /> <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 54 of 317
The URL can be used to link to this page
Your browser does not support the video tag.