Laserfiche WebLink
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Redwood City use only Page 49 of 59 <br />Project ID 1 Location Length (lf.) Existing Dia. (in.) Proposed Dia. (in.) <br />C6 <br />Franklin St., Wilson St., Middlefield Rd., Jefferson <br />Ave. (Sequoia Station to s/o Redwood Creek <br />siphon) <br />1,990 6/8/10 10/12 <br />C72,3 <br />Winslow St. (Standish St. to Brewster Ave.), <br />Brewster Ave (Winslow St. to west of Veterans <br />Blvd.) <br />1,430 15 4 18 (new alignment) <br />C83 Whipple Ave. (Woodstock Pl. to Arguello St.) 3,330 8 10 <br />C92, 3 Brewster Ave. (Hudson St. to Arch St.) 2,250 10 12/15 <br />C10 James Ave. (Jeter St. to Hudson St.) 640 8/10 15 <br />C113 Jefferson Ave. (Myrtle St. to Iris St.) 970 8 10 <br />C12 Vera Ave. (w/o King St. to Hudson St.) 960 8 12 <br />C132 Lincoln Ave. (Hudson St. to El Camino Real) 2,600 24 30/33 <br />C142, 3 Roosevelt Ave. (Valota Rd. to Hudson St.) 2,510 21 24 <br />C15 Roosevelt Ave. (Grand St. to Fulton St.) 510 8 10 <br />C16 Maddux Dr., Washington Ave., Virginia Ave. <br />(Kensington Rd. to Goodwin Ave.) 3,170 8/12 12/15 <br />C17 Hampton Ave., Sierra St., Palm Ave., Kentfield <br />Ave. (Valota Rd. to Palm Ave.) 1,760 6/8 12 <br />C182, 3 <br />Truman St., McGarvy Ave., Fairview Ave., <br />Roosevelt Ave. (southeast of McGarvy Ave. to <br />Roosevelt Ave.) <br />1,210 12 15 <br />C193 Carson St. (Dewey St. to southeast of Roosevelt <br />Ave.) 820 8 10 <br />C20 Glenwood Ave., Canyon Rd., Jefferson Ave. <br />(Breeze Pl. to Oak Ridge Dr.) 1,210 8 12/15 <br />C21 Vista Dr. (Hamilton Way to Toyon Way) 300 6 10 <br />C223 Jefferson Ave. (Ruby St. to Quartz St.) 310 6 8 <br />C23 Madison Ave. (Topaz St. to Ruby St.) 580 12 15 <br />C24 Myrtle St. (northwest of Harrison Ave.) 320 6 8 <br />C25 Broadway St. (El Camino Real to California St.) 490 6 8 <br />C26 5 Davit Ln. (Keelson Cir. to PS10) 520 8 12 <br />C27 6 Sanitary Sewer Pump Station No. 9 <br />Improvements 724 4 6 <br />EFFECTIVENESS <br />The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element: <br />• Has the City adhered to its system evaluation/condition assessment schedule? <br /> <br />3 Project could be reduced in size or eliminated by 30 percent RDI/I reduction. <br />4 The existing deficient pipe is the 15-inch sewer that parallels (diagonally) Winslow St. from Standish St. to Brewster <br />5 An alternative to this project could include extending the PS9 force main to PS10 with associated upgrades to pumps and electrical/backup <br />power systems at PS9. <br />6 Project will upgrade PS9 and replace (upsize) its force main; the project has already been designed and bid by the City. <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 56 of 317