My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.08.25 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.08.25 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:40:02 PM
Creation date
8/26/2025 12:35:53 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Date
8/25/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
8/26/2025 12:39 PM
Modified:
8/26/2025 12:39 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 5 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />investments in these areas to promote equitable development and improve mobility for historically <br />underserved populations. Figure 3 identifies the portion of Redwood Avenue located within the EPC. No <br />burdens to specific communities are anticipated as a result of this project, and its benefits are fully aligned <br />with the City’s transportation goals. <br />Figure 3: Equity Priority Community Location Map <br />FISCAL IMPACT <br />No additional funding is required for this project. This project has no impact on the General Fund. Funding <br />for this project was available from a Measure A/W grant awarded by the San Mateo County <br />Transportation Authority and Senate Bill 1 (SB1) funds. Redwood Avenue was included on the approved <br />list for FY 2024-25 SB-1 funding. Ongoing maintenance costs related to this project will be managed by <br />Public Works Services. <br />Table 1: Project Funding <br />Fund Program Fund Amount <br />Measure A/W Grants (Fund 264)$1,053,015 <br />SB1- Roadway Pavement Management Program (Fund 277)$ 171,159 <br />Total $1,224,174 <br />ENVIRONMENTAL REVIEW <br />7.G. - Page 4 of 5 <br />110
The URL can be used to link to this page
Your browser does not support the video tag.