Laserfiche WebLink
Page 8 of 12 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />Green Infrastructure for Substantial Commercial Remodels <br />Green Infrastructure (GI) refers to the use of natural areas and features designed to manage stormwater <br />by slowing runoff into the City’s storm system, while also improving the quality of water flowing to San <br />Francisco Bay. It is regulated under the National Pollutant Discharge Elimination System’s Municipal <br />Regional Permit (MRP), which governs how cities and counties within the San Francisco Bay Area Region <br />may discharge stormwater into the Bay and its tributary creeks. While cities must comply with Permit <br />terms, there is no outside funding associated with this obligation. <br />On June 24, 2019, as required by the MRP, Redwood City adopted a GI Plan outlining its long-term strategy <br />to meet MRP goals for significantly reducing mercury and polychlorinated biphenyls (PCBs) entering the <br />Bay. The strategy has two parts, relying on a combination of public and private funding: <br />1. Construct a regional stormwater control project to capture and treat runoff from a large portion <br />of the City at public expense. The Red Morton Regional Stormwater Project, now nearing 100% <br />design, would treat approximately 1,600 acres within the Redwood Creek watershed. <br />2. Require private development projects to install green infrastructure onsite and in the public right- <br />of-way at levels exceeding the MRP’s minimum thresholds. <br />On August 26, 2019, Redwood City adopted the GI Plan Development Standards to specify which projects <br />would be required to install additional GI facilities based on their size and impact. These were considered <br />“no missed opportunity” sites—projects where the scope of work created a clear opportunity to integrate <br />GI elements. Examples included new buildings that typically regraded entire sites, large developments <br />that fully reconstructed frontage improvements, and substantial commercial remodels involving site <br />work, utility upgrades, and frontage improvements. At that time, the City determined that all new <br />development, as well as commercial remodels of at least 10,000 square feet, would be subject to its GI <br />requirements. <br />On September 23, 2024, Redwood City updated several municipal code sections as part of a streamlining <br />and cleanup effort. As part of this process, the GI requirement for substantial commercial remodels was <br />revisited, and the threshold was increased to remodels of at least 25,000 square feet. When adopting the <br />higher threshold, the City Council also directed staff to analyze the impacts of this requirement and assess <br />how it aligns with similar efforts in other jurisdictions within the San Francisco Bay Area region. <br />Current Market Conditions and Feedback from Stakeholders <br />The current economic climate, as described in the housing section of this report, impacts not only new <br />residential development, but also commercial property owners and prospective tenants. <br />Over the past few months, staff has engaged with property owners, potential commercial tenants, and <br />real estate brokers to better understand how the City’s GI requirements may be affecting the ability of <br />businesses to lease commercial space in Redwood City. Key takeaways from these discussions include: <br />1.Cost Prohibitive Requirements: The expense of completing GI improvements for remodels is <br />often prohibitive due to several factors. High upfront costs for materials and labor, and the need <br />for additional engineering services to create a site-specific design can increase project expenses. <br />10.A. - Page 8 of 31 <br />217