My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.10.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.10.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2025 2:44:53 PM
Creation date
10/14/2025 2:42:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
10/13/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 4 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />Figure 1. Project Location Map – Cambridge and Emerald Hills <br />ANALYSIS <br />Construction began in January 2025 and concluded in July 2025. <br />One contract change order (CCO) was approved for a total of $80,584 (two percent of the original contract <br />amount), which is within the approved contingency amount. The CCO covered items regarding site <br />conditions that differed from the plan set, conflicts with existing utilities, delays due to troubleshooting <br />the existing water system, and reconciliation of project quantities. Each of these items led to a change in <br />time and/or costs related to equipment, materials, or labor. <br />The City Engineer has determined the improvements outlined by the project plans and specifications are <br />complete. Therefore, staff recommend acceptance of the project, release of all bonds and retention and <br />filing of a notice of completion. <br />7.A. - Page 2 of 4 <br />8
The URL can be used to link to this page
Your browser does not support the video tag.