My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.10.27 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.10.27 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2025 3:13:24 PM
Creation date
10/28/2025 3:09:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
10/27/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City Stormwater Roadmap <br />Current Stormwater Challenges <br />September 2025 4-4 Schaaf & Wheeler <br />4.3.4 High-Risk Pipe Condition Assessment <br />A condition assessment is recommended for the City’s pipe networks. The assessment should <br />focus on CMP segments, steep segments, and bay land segments. Corrugated segments are <br />highly susceptible to corrosion and collapse, particularly under high flow or tidal conditions. <br />Currently, the City lacks CCTV or structural condition data for many of these assets, making <br />proactive inspection and prioritization essential. <br />4.3.5 Trash Capture and Water Quality Compliance <br />Compliance with the MRP remains a high-priority regulatory requirement. Redwood City must <br />achieve full compliance with trash capture requirements, either through full trash capture systems <br />or equivalent measures, by December 31, 2025. “Full trash capture” refers to a system that can <br />capture and remove all trash particles larger than 5 millimeters from stormwater runoff. While the <br />City has allocated $325,000 for MRP compliance in FY 2025 – 26, additional investment will be <br />required to achieve full system compliance (FY 2025 – 26 Adopted Budget, Redwood City, 2025). <br />4.3.6 Redwood Creek Channel Integrity <br />Structural assessments of the Redwood Creek concrete channel have identified cracking, <br />undermining, joint separation, panel displacement, and localized erosion. These conditions pose <br />a long-term risk to both conveyance capacity and adjacent infrastructure. Findings were <br />documented in a deficiency review by BKF Engineers (Redwood Creek Deficiency Review, BKF <br />Engineers, 2012) and in a more recent inspection by Wood Rodgers (Redwood Creek Structural <br />Assessment, Wood Rodgers, 2023). <br />Two channel failures were reported in 2023 and 2024 at 1525 Connecticut and 1891 Palm <br />Avenue, respectively, both occurring following storm events. Although the City has completed <br />permanent repairs at these sites, the channel remains vulnerable due to the high flow volumes it <br />conveys during major storms. Ongoing monitoring and targeted repairs are a priority to address <br />this risk. <br />11.A. - Page 21 of 53 <br />452
The URL can be used to link to this page
Your browser does not support the video tag.