My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.10.27 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.10.27 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2025 3:13:24 PM
Creation date
10/28/2025 3:09:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
10/27/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City Stormwater Roadmap <br />Preparing for Climate Change <br />September 2025 5-2 Schaaf & Wheeler <br />Rodgers, 2017). Although the City’s standards require 100-year capacity, the 30-year storm was <br />recommended for capital improvements due to feasibility constraints. <br />The industry standard for closed conduit systems is typically the 10-year design storm, consistent <br />with the County of San Mateo’s Drainage Manual (2023). The City should consider updating its <br />design criteria to require 10-year capacity with the hydraulic grade line at least 0.5 feet below the <br />inlet rim and provide 100-year capacity within the public right-of-way, to better align with industry <br />standards and provide a realistic performance metric. <br />Additionally, the City should consider defining design criteria for other infrastructure types: <br /> Pump stations: Design for the 100-year storm event. <br /> Open conveyance systems: Design for the 100-year storm event. <br />Refining design criteria for stormwater infrastructure will aid the City in effectively and sustainably <br />managing stormwater flooding. <br />5.3 Groundwater Monitoring <br />The Sea-Level Rise Vulnerability and Adaptation Planning Study highlights the rising risk of <br />shallow groundwater emergence, particularly in low-lying neighborhoods such as Redwood <br />Shores (ESA, 2024). While specific depth thresholds are not prescribed, the report calls for the <br />City to: <br /> Begin incorporating groundwater monitoring and modeling into planning for capital <br />projects; and <br /> Use groundwater-aware design practices to reduce risks of infrastructure buoyancy, <br />corrosion, and infiltration failures (ESA, 2024). <br />11.A. - Page 23 of 53 <br />454
The URL can be used to link to this page
Your browser does not support the video tag.