My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.10.27 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.10.27 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2025 3:13:24 PM
Creation date
10/28/2025 3:09:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
10/27/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City Stormwater Roadmap <br />Recommended Assessments <br />September 2025 6-6 Schaaf & Wheeler <br />transparency. The goal is to support a repeatable, scalable program for long-term maintenance <br />planning and performance tracking. <br />Finally, the assessment should examine organizational structure and staffing. Redwood City has <br />maintenance staff dedicated and budgeted for stormwater infrastructure. However, the City’s <br />Engineering and Transportation Department handles stormwater projects on a project basis. The <br />study should evaluate whether creating a dedicated stormwater team would increase operational <br />efficiency and reduce long-term system risks. <br />Estimated Cost: $40,000 to $60,000 <br />6.1.12 Developing the Master Plan <br />The Master Plan documents should summarize the above-mentioned items, including the entire <br />existing storm system, outline the system’s current performance, detail areas currently subject to <br />flooding, list and prioritize improvement projects, include a cost estimate for all improvements, <br />and summarize all technical methodologies and model results. The report will also include an <br />operation and maintenance plan and financial analysis. <br />Estimated Cost: $40,000 to $50,000 <br />6.1.13 Conceptual Designs <br />In collaboration with the City, the highest priority projects crucial to successful CIP implementation <br />should be listed. Conceptual designs for these projects should be developed, which will serve as <br />the basis for more detailed planning and eventual implementation. These conceptual designs are <br />intended to be comprehensive enough to demonstrate the viability and potential impact of the <br />proposed improvements. By having these plans at a planning level of detail, the City can enhance <br />its competitiveness when seeking funding opportunities through grants and other sources. <br />Estimated Cost: $50,000 to $100,000 <br />The components illustrated above may be completed separately from each other if funding does <br />not allow. However, we recommend the Stormwater Master Plan be completed sequentially under <br />a single analysis, which is typical of master planning efforts. This reduces the total cost, time, and <br />risk of duplication. Table 6-1 below demonstrates the estimated total cost breakdown of the <br />Stormwater Master Plan. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />11.A. - Page 29 of 53 <br />460
The URL can be used to link to this page
Your browser does not support the video tag.