My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.10.27 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.10.27 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2025 3:13:24 PM
Creation date
10/28/2025 3:09:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
10/27/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City Stormwater Roadmap <br />Funding Program <br />September 2025 7-3 Schaaf & Wheeler <br />Both a Parcel Tax and a Community Facilities District (CFD) require several months of <br />preparation before placement on the ballot. For a Parcel Tax, the final resolution must be <br />approved at least 88 days before the election, with an additional three to four months typically <br />needed beforehand for financial modeling, drafting, and polling. Similarly, a CFD involves a <br />series of resolutions, with the final resolution due at least 90 days before the election and three <br />to four months of preparation prior to the initial resolution. In both cases, polling may extend the <br />timeline. <br />7.1.3 Special Assessment <br />A benefit assessment district assigns project costs in direct proportion to the benefits received. <br />Benefit assessment districts are often formed for specific projects within a specific watershed. <br />The only properties assessed are those that directly benefit from the projects and in direct <br />proportion to that benefit. <br />The benefit assessment is not seen as a practical solution to funding the stormwater program as <br />a whole based on the extensive benefit findings required separating general and special <br />benefits, as well as the additional assessment engineering time and expense required in order to <br />support legally defensible findings for a City-wide assessment. An assessment requires <br />approximately three to four months for calculations and preparation of the engineer’s report, <br />followed by an additional two and a half to three months for the resolution and ballot process. <br />7.1.4 Property-Related Fee <br />A property-related fee is a fee for service attributable to the parcel being charged. A fee for <br />stormwater services is levied upon the county tax roll and is imposed as an incident of property <br />ownership. As such, it would be subject to the substantive and procedural requirements of <br />California Constitution Article XIII D (known commonly by its enacting ballot measure: <br />Proposition 218). <br />The fee must be submitted and approved by a majority vote of the property owners or by a two- <br />thirds vote of the electorate. The amount charged to each parcel must be proportional to the <br />cost of service attributable to that parcel. Due to this proportionality requirement, costs <br />attributable to public parcels should be paid by City revenues (e.g., General Fund appropriation) <br />or by individual City departments. <br />For a property owner election, each parcel generally receives one ballot, and each ballot has one <br />vote regardless of the potential levy amount, although the City may also have the power to <br />provide for weighted voting. In one-parcel-per-vote elections, a large commercial parcel with a <br />calculated levy that is an order of magnitude greater than that of a smaller parcel would have the <br />same single vote as the smaller parcel. <br />The revenue stream from a property-related fee may be used for capital, annual operating, and <br />maintenance costs. This revenue stream could also be pledged as credit support for a revenue <br />bond issued to fund major capital improvements. It typically takes about three to four months to <br />complete the cost-of-service analysis for a property-related fee, followed by an additional four to <br />five months for the notice and election process. <br />11.A. - Page 34 of 53 <br />465
The URL can be used to link to this page
Your browser does not support the video tag.