My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.10.27 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.10.27 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2025 3:13:24 PM
Creation date
10/28/2025 3:09:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
10/27/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City Stormwater Roadmap <br />Funding Program <br />September 2025 7-5 Schaaf & Wheeler <br />The statutory limit in imposing these fees is that they may not exceed the estimated <br />reasonable cost of service. Data used to justify fee amounts must be prepared and <br />made available to the public in advance of the public hearing. <br />Since the City already charges a deposit-based fee for plan review and inspection <br />accounts, further fees may be difficult to impose. The chief benefit of examining the <br />viability of regulatory fees is that they may be approved by consensus of the City after <br />proper public notice and public hearing processes. <br />Grants <br />There are grant opportunities for stormwater, flood control, and climate adaptation projects in <br />California. These grants are competitive and require a good deal of effort to secure. The City <br />currently has an active contract with RPPG for grant writing and identification which can help the <br />City provide project specific funding for stormwater projects. <br />While the City will need to decide which grants are most applicable for its needs, the Sea-Level <br />Rise Vulnerability and Adaption Planning Study recommends the Hazard Mitigation Grant <br />Program or Proposition 1 Climate Ready Grants as potential options the City may explore (ESA, <br />2024). <br />7.2 Financial Recommendations <br />As capital and operational funding needs become clearer, the City must evaluate available <br />funding options to determine the most appropriate mechanism(s). This evaluation may include <br />identifying grant opportunities, assessing existing funding sources, conducting preliminary <br />modeling of potential charges under various funding mechanisms, and polling property owners <br />or voters to gauge support. The information gathered through this process will provide essential <br />data to guide the selection of a funding mechanism and shape the City’s approach to public <br />engagement and community outreach. <br />NBS recommends a special tax, such as a parcel tax or Community Facilities District (CFD), as <br />the most flexible funding tool, as it can support both capital improvements and ongoing <br />operations and maintenance. However, due to the two-thirds voter approval requirement, this <br />option may not be viable without strong community support. Community engagement and <br />polling will be essential to assess whether this threshold can be met. <br />Alternatively, a property-related fee, while less flexible due to the requirement for a cost nexus, <br />may offer a more attainable approval threshold, requiring only majority support from property <br />owners. The City of San Mateo, for example, successfully implemented a stormwater fee, with a <br />medium-sized parcel (0.11 to 0.17 acres) charged approximately $8 per month. <br />Stormwater Master Plans are often funded through general funds or other sources for <br />municipalities without a long-term funding strategy. However, implementing a special tax or <br />property-related fee would provide sustainable funding for the Capital Improvement Program <br />(CIP) identified in the Stormwater Master Plan and future master planning efforts. <br />Given the distinct stakeholder groups associated with each funding mechanism, conducting a <br />funding feasibility study, including preliminary rate modeling and impact analysis, can help <br />inform targeted polling and support the selection of the most viable funding strategy. <br />11.A. - Page 36 of 53 <br />467
The URL can be used to link to this page
Your browser does not support the video tag.