Laserfiche WebLink
Page 3 of 12 <br /># DEVELOPMENT FEE Conditions – Fees listed below are estimates. Rates in effect at building permit issuance will apply unless <br />otherwise noted. See Master Fee Schedule for details. <br />Compliance <br />D6 Wastewater Treatment Capacity Fee. Pay wastewater treatment capacity fees for the net new dwelling units and/or <br />commercial/industrial average daily volume resulting from the project estimated at $182,231.[Section 27.101 of Municipal <br />Code][Engineering][SDR] <br />Prior to Building Permit <br />Issuance <br />D7 Water Capacity Fees. Pay water capacity fees for the net new dwelling units and/or commercial/industrial average daily <br />volume resulting from the project, estimated at $131,729. [Section 38.15 of Municipal Code][Engineering][SDR] <br />Prior to Building Permit <br />Issuance <br />D8 Cost Recovery Fees. Pay all cost recovery fees and replenish the evergreen account as determined by the Community <br />Development Director to ensure funds are available to complete processing of project elements such as an affordable housing <br />plan, development agreement, or MMRP. [Planning][COA] <br />Prior to Building Permit <br />Issuance <br />D9 Notice of Fees Protest. Protests of any fees, dedications, reservations, or other exactions imposed by the City as part of the <br />approval or as a condition of approval of the project pursuant to California Government Code Section 66020 and shall be filed <br />within 90-days from the date of the project approval. [OFFICE OF THE CITY ATTORNEY][SDR] <br />90-days from Project <br />Approval <br /># BUILDING Conditions Compliance <br />B1 Electric Vehicle Charging Stations. Provide and install 9 electric vehicle charging spaces and 26 stalls with EV conduit, with <br />the appropriate number of accessible spaces with at least one being accessible and one van accessible, including <br />considerations for signage and time limits. Compliance shall be demonstrated on the building permit plans. [COA <br />Prior to Building Permit <br />Issuance <br />B2 Carpool, Vanpool and Low- Emission Parking. 10 percent of total parking spaces shall be for any combination of low-emitting, <br />fuel-efficient and carpool/vanpool vehicles. In this case the total required number is 18 spaces, 9 of which are EV spaces, <br />therefore 9 remining spots shall be striped or signed for carpool and vanpool and low-emitting vehicles. <br />Prior to Building Permit <br />Issuance <br />B3 Verification of Dimensions. Provide a survey report, prepared by a licensed surveyor, verifying site building location, setbacks, <br />and building height, if applicable, to the Building Division for review and approval prior to permit issuance. Survey report shall <br />be kept on the project site throughout the course of construction and be made available to the Building Inspector for all <br />foundation forms and footings inspections. [Section 9.40 of Municipal Code][SDR] <br />Prior to Building Permit <br />Issuance and again prior <br />to Foundation Framing <br />Inspection <br />B4 Sales and Use Taxes. Register with the Board of Equalization to create an ID prior to maximize the City’s allocation of sales <br />and use taxes associated with project construction. Contact the Finance Department at (650) 780-7213 [City Revenue <br />Manager] to coordinate on this process and requirements. [Guidance Brochure][COA] <br />Prior to Building Permit <br />Issuance or <br />Commencement of <br />Operations if no Building <br />Permit is Required <br />B5 Hours of Construction. Construction activity is permitted between 7:00 a.m. and 8:00 p.m., Monday through Friday, except <br />as permitted on weekends by the Building Official, and in accordance with the City’s Noise Ordinance. Schedule noisiest <br />construction activities, as identified under Section 24.30, on weekdays from 9:00 a.m. to 4:00 p.m. when ambient noise levels <br />are the highest. [Section 24.32 of Municipal Code][SDR] <br />During Construction <br />B6 Construction Sign. Install and provide photo verification of at least one 36” x 48” (minimum) construction sign in a visible <br />location along the project frontage for the duration of construction. The sign shall include, at minimum, the following <br />Prior to Building Permit <br />Issuance <br />ATTY/RESO.0110/CC RESO APPROVING ARCHITECTUAL PERMIT (YMCA PROJECT) – EXHIBIT A <br />REV: 11-06-25 VR