My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16368
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2025 9:44:34 AM
Creation date
11/12/2025 9:43:36 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
11/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Water Rate Cost-of-Service Study <br />Section 3. Revenue Requirements <br /> <br /> <br />HF&H Consultants, LLC | July 8, 2025 | Page 14 of 53 <br />Section 3. Revenue Requirements <br />The revenue requirements analysis starts by determining the FY 2024-25 revenue <br />requirements based on the budgeted O&M and capital expenditures. Revenue requirements <br />for each fiscal year are then projected over the Study Period. Revenue increases needed to <br />cover the projected revenue requirements are then determined. <br />Since the City provides water through one integrated system of potable and recycled water, <br />the rates reflect the realities of the system. As a result, all water, whether potable or recycled, <br />will be considered as part of the same system portfolio. <br />DEMAND PROJECTIONS <br />The revenue requirements projected during the Study Period are based on the City’s unique <br />circumstances. Projected customer demand is particularly significant because it affects certain <br />variable expenses such as the cost of purchased water as well as the revenue from water <br />sales. Customer demand depends on the types of customers, the nature of their demands, <br />the trends in their water use, growth, and climate, among others. <br />The City consists of single-family residences, multi-family residences, commercial (including <br />schools), industrial, municipal, and irrigation water customers. The service area is largely <br />developed, but the City’s General Housing Element identifies plans for more housing to meet <br />future population growth. For purposes of this rate study, no growth in water demand nor in <br />growth of accounts was assumed. Connection fee revenue from growth is assumed, but the <br />City did not estimate increased operational costs or supply costs explicitly due to growth <br />because the volume is expected to be insignificant on the annual time scale. <br />Water demand projections used in this study are shown in Figure 3-1. Projections are based <br />on the two-year average of billing data from FY 2022-23 to FY 2023-24. <br />Figure 3-1. Five-Year Modeled Demand Projections <br /> <br />REVENUE REQUIREMENT ASSUMPTIONS AND PROJECTIONS <br />Expense projections combined with contributions to reserves become the revenue <br />requirements. The City’s operating and capital budgets were relied on for FY 2024-25 <br />expenses in the first-year revenue requirement. The assumptions shown in Figure 3-2 were <br />used to project revenue requirements through FY 2027-28. <br />Customer Class FY 2025-26 FY 2026-27 FY 2027-28 <br />Multi Family Residential 824,419 824,419 824,419 <br />Commercial 631,112 631,112 631,112 <br />Commercial Irrigation 311,165 311,165 311,165 <br />Residential Irrigation 174,878 174,878 174,878 <br />Single Family Residential 1,660,000 1,660,000 1,660,000 <br />Commercial Recycled 10,301 10,301 10,301 <br />Annual Water Use (HCF) 3,611,875 3,611,875 3,611,875 <br />ATTY/RESO.0109/CC RESO WATER RATES - EXHIBIT A <br />REV: 11-05-25 MI
The URL can be used to link to this page
Your browser does not support the video tag.