My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Purchase Agreement
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Seaport Centre Owner's Association - Purchase Agreement
>
Purchase Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 4:05:57 PM
Creation date
11/18/2025 4:00:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
HCP LS Redwood City, LLC Metropolitan Life Insurance Company Seaport Centre Owner's Association
RMP File Number
304
Date
10/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Seaport Centre Levee System Operation and Maintenance Manual <br />July 2023 <br />1 OVERVIEW AND ACCESS......................................................................................................................................1 <br />1.1 <br />Purpose of Manual...................................................................................................................................1 <br />1.2 <br />Changes to the Project or the Manual..............................................................................................1 <br />1.3 <br />Project Vehicular Access........................................................................................................................1 <br />2 NORMAL OPERATION, MAINTENANCE AND REPAIR...............................................................................2 <br />2.1 <br />Introduction................................................................................................................................................2 <br />2.2 <br />Levee Embankments................................................................................................................................2 <br />2.2.1 Maintenance of grass and sod cover.........................................................................................2 <br />2.2.2 Animal Control Program (baiting, trapping, and barriers).................................................3 <br />2.2.3 Repair animal damage on levee slopes and at levee toe...................................................3 <br />2.2.4 Levee embankment and slope repairs......................................................................................3 <br />2.2.5 Repair and maintenance of high ground areas along levee alignment .......................3 <br />2.2.6 Repair of levee damage caused by flood events (scour, slumps, and sags)...............3 <br />2.3 <br />Floodwall......................................................................................................................................................3 <br />2.3.1 Removal or trimming of vegetation within levee easement.............................................4 <br />2.3.2 Removal or pruning of all vegetation encroaching within levee easement...............4 <br />2.3.3 Repair of floodwall damage..........................................................................................................4 <br />2.4 <br />Interior Drainage System.......................................................................................................................4 <br />2.4.1 Outfall flap gate service and repairs...........................................................................................4 <br />2.4.2 Pipe inspection, repairs, and sediment removal....................................................................4 <br />2.4.3 Removal of sediment and vegetation at outfalls..................................................................5 <br />2.4.4 Repair and maintenance of outfall slope protection...........................................................5 <br />2.4.5 Positive Closure Valve.....................................................................................................................5 <br />2.5 <br />Miscellaneous Maintenance Activities..............................................................................................5 <br />2.5.1 Miscellaneous Repairs and Maintenance.................................................................................5 <br />2.5.2 Remove unauthorized encroachments in levee easement (stairs, landscaping, <br />utilities, fences, irrigation, etc)......................................................................................................5 <br />2.5.3 Maintenance of authorized encroachments in levee easement.............................5...... <br />2025.276 - SEAPORT PURCHASE AGREEMENT <br />REV: 10-15-25 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.