Laserfiche WebLink
Seaport Centre Levee System Operation and Maintenance Manual <br />July 2023 <br />2.6 Storm Water Pump Stations............................................................. <br />3 INSPECTION AND REPORTS........................................................................... <br />3.1 Introduction............................................................................................ <br />3.2 Inspection and Reporting Frequency ............................................ <br />3.3 City Inspections of Flood Control Elements ................................ <br />BKF Engineers, Seaport Centre Levee Improvement Plans, January 2023 (Record Plans to be <br />prepared) <br />BKF Engineers, Seaport Centre Interior Drainage Analyses, July 12, 2017 <br />Moffat & Nichol, Seaport Centre Levee Recertification, April 07, 2016. <br />Korth Sunseri Hagey Architects, Seaport Plaza Improvement Plans, Wilson Cornerstone, January <br />2011, <br />BKF Engineers, Seaport Centre Maintenance District Condition Report, April 08, 2010. <br />US Army Corps of Engineers, Levee Owner's Manual for Non -Federal Flood Control Works, March <br />2006. <br />City of Redwood City, Sea Port Centre Improvement Plans, July 1984. <br />2025.276 - SEAPORT PURCHASE AGREEMENT <br />REV: 10-15-25 VR <br />