My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.11.24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.11.24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 12:31:30 PM
Creation date
11/25/2025 12:28:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
11/24/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 7 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br /> GILBANE AGREEMENT SUMMARY <br />Agreement/Amendment Time Period Covered Contract Amount <br />Original Agreement 9/16/2019 – 10/6/2021 $2,916,044 <br />Amendment No. 1 10/7/2021 – 8/2/2023 $53,152 <br />Amendment No. 2 8/3/2023 – 7/14/2024 $653,782 <br />Amendment No. 3 7/15/2024 – 2/28/2025 $695,460 <br />Amendment No. 4 3/1/2025 – 6/30/2025 $325,800 <br />Amendment No. 5 7/1/2025 – 8/30/2025 $162,910 <br />Amendment No. 6 9/1/2025 – 11/30/2025 $244,365 <br />Amendment No. 7 (proposed)12/1/2025 until services are <br />complete <br />$285,092 <br />TOTAL $5,336,625 <br />ANALYSIS <br />The Project initially began in July 2021 and was originally estimated to be completed by July 2023, and the <br />City approved an extension to August 2023. However, Thompson Builders Corporation (TBC) has been <br />unable to maintain the project schedule and has repeatedly extended the expected completion date. The <br />City and TBC entered into a Project Extension Agreement in which TBC committed to substantial <br />completion of building construction by March 15, 2025. TBC failed to complete the project by that <br />deadline, and construction activities remain underway. <br />Due to ongoing delays, the City needs to amend the agreements with ELS as the Construction <br />Administrator, and with Gilbane as Project Manager, to extend their services. In the City’s Project <br />Extension Agreement with TBC, TBC is responsible for the City’s consultant and project management <br />expenses after February 28, 2025. <br />Construction Administration refers to the duties performed by architects during the construction phase <br />of a project to ensure the project is being built according to the approved plans, specifications, and <br />contract documents. It serves to maintain the design intent, ensuring the finished product is consistent <br />with the approved drawings and design. <br />Key responsibilities typically include: <br />•Observation and Site Visits: Regularly visiting the construction site to observe the progress and <br />quality of the executed work. <br />•Reviewing Shop Drawings and Submittals: Reviewing detailed drawings or plans submitted by the <br />contractor to ensure they conform to the design concept. <br />•Change Orders: Reviewing, approving, or providing recommendations when there are changes to <br />the original plan, such as unforeseen conditions or changes requested by the owner. <br />7.C. - Page 4 of 15 <br />105
The URL can be used to link to this page
Your browser does not support the video tag.