My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.12.08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.12.08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 11:32:33 AM
Creation date
12/11/2025 11:27:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
12/8/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
771
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 5 of 6 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />EQUITY IMPACT STATEMENT <br />All City actions are assessed for impact. Because this item is on the consent calendar, this section indicates <br />assessment process, not findings. The anticipated impact of this policy, program, or action has been <br />assessed in the following ways: <br /> <br />Reviewed from similar or relevant past program or policy in Redwood City <br />Reviewed data related to a standard or emerging best practice <br /> <br />FISCAL IMPACT <br />There is no anticipated General Fund impact associated with this contract. The project will be funded from <br />the Sewer Collection System Replacement Program (75133), which had an available balance of <br />approximately $2.3M as of October 29, 2025. <br />Table 2. Project Budget <br />Design and construction administration contract $618,227 <br />Contingency (up to 20 percent)$123,645 <br />Project Administration $51,000 <br />Estimated total project design cost $792,872 <br />Project Administration costs are budgeted from the estimated available funding in Program 75133. These <br />costs include Engineering and Transportation staff time for project management and coordination to keep <br />the project on schedule and within the dedicated project budget. <br />ENVIRONMENTAL REVIEW <br />This activity is not a project under California Environmental Quality Act (CEQA) as defined in CEQA <br />Guidelines, section 15378, because it has no potential for resulting in either a direct or reasonably <br />foreseeable indirect physical change in the environment. <br />PUBLIC NOTICE <br />Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting. <br />7.C. - Page 5 of 28 <br />140
The URL can be used to link to this page
Your browser does not support the video tag.