My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.12.08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.12.08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 11:32:33 AM
Creation date
12/11/2025 11:27:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
12/8/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
771
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orange text indicates modified timeline Page 3 of 11 <br />Attachment B – Transportation Impact Fee Project List 2025 <br />* Link to GIS Mapping of Projects <br />Project Name/General <br />Location, where <br />applicable <br />Description CIP <br />(Y/N) <br />Estimated <br />Start Year <br />Total Project <br />Costs (Including <br />All Funds) <br />% Funded <br />with Fee <br />Revenue <br />Amount <br />Funded w/ Fee <br />Revenue <br />El Camino Real, traffic <br />safety improvements <br />within City Limits-Vision <br />Zero project <br />Install corridor enhancements <br />including, but not limited to: <br />upgrading lane lines, bike safety <br />improvements, adjusting median <br />noses, installing retroreflective <br />backplates, installing traffic <br />calming measures, installing <br />advanced limit lines at <br />intersections, and lighting <br />enhancements. Caltrans has a <br />planned installation of a Class IV <br />bikeway along the entire El <br />Camino Real within city limits. <br />The City would install protected <br />intersection treatments and <br />HAWK beacons, where feasible. <br />Y within 5 <br />years <br />within 10 <br />years <br />$6,000,000 25%$1,500,000 <br />Woodside Road, <br />between Hess Road <br />and Kentfield Avenue <br />Install corridor enhancements <br />including, but not limited to: <br />installing retroreflective <br />backplates, installing speed <br />feedback signs, installing <br />advanced limit lines at <br />intersections, and installing bulb <br />outs at unsignalized <br />intersections. Funds would also <br />be used to conduct a complete <br />streets corridor study and <br />coordinate with Caltrans to <br />conduct a bike facility feasibility <br />study. <br />Y within 10 <br />years <br />$2,045,000 25%$511,250 <br />9.B. - Page 13 of 39 <br />518
The URL can be used to link to this page
Your browser does not support the video tag.