Laserfiche WebLink
Orange text indicates modified timeline Page 4 of 11 <br />Attachment B – Transportation Impact Fee Project List 2025 <br />* Link to GIS Mapping of Projects <br />Project Name/General <br />Location, where <br />applicable <br />Description CIP <br />(Y/N) <br />Estimated <br />Start Year <br />Total Project <br />Costs (Including <br />All Funds) <br />% Funded <br />with Fee <br />Revenue <br />Amount <br />Funded w/ Fee <br />Revenue <br />Redwood Shores <br />Parkway, between Twin <br />Dolphin Dr and <br />Shoreline Dr-Vision <br />Zero project <br />Install corridor enhancements <br />including, but not limited to: <br />installing wayfinding signage for <br />bikers, installing accessible <br />pedestrian signals (APS), <br />adjusting median noses, installing <br />traffic calming measures, <br />installing advanced limit lines at <br />intersections, installing green <br />bike conflict markings, and <br />tightening curb radii. <br />Y within 10 <br />years <br />$1,220,000 25%$305,000 <br />Commuter Ferry <br />Service <br />Construct Ferry Terminal in <br />Redwood City. <br />Y within 5 years $23,760,000 25%$5,940,000 <br />Alameda de las Pulgas <br />Corridor Improvements <br />Install pedestrian safety <br />improvements along Alameda de <br />las Pulgas. <br />Y within 5 years $940,000 25%$235,000 <br />Caltrain Grade <br />Crossings <br />Conduct environmental review <br />studies for Caltrain grade <br />separation within Redwood City <br />(6 intersections: Maple, Main, <br />Chestnut, Broadway, Brewster, <br />Whipple) <br />Funds would be used for <br />Environmental Review. <br />Y 1-2 years <br />within 5 years <br />$4,000,000 25%$1,000,000 <br />Caltrain Grade <br />Crossings <br />Site improvements, bike and ped <br />undercrossing at James, <br />connections to the new transit <br />center. <br />Y 10 to 20 years $50,000,000 25%$12,500,000 <br />9.B. - Page 14 of 39 <br />519