My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.12.08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.12.08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 11:32:33 AM
Creation date
12/11/2025 11:27:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
12/8/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
771
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F-2 LID Treatment Reduction Credit Calculation <br />If more than one category applies, choose only one of the applicable categories and fill out the table for that category. <br />Fill in all cells with blue highlighting that pertain to the chosen Special Project Category. <br />Category <br />Site <br />Coverage <br />(%) <br />Project <br />Density16 <br />or FAR16 <br />Allowable <br />Credit <br />(%) <br />Applied <br />Credit <br />(%) <br />A N.A.100% <br />50% <br />75% <br />100% <br />C <br />0% <br />F-3 Narrative Discussion of the Feasibility/Infeasibility of 100% LID Treatment: <br />F-4 Select Certified Non-LID Treatment Measures: <br />Impervious Area <br />Created/Replaced <br />(sq. ft.) <br />B <br />Density/Criteria <br />See above in F-1 <br />Res ≥ 50 DU/ac or FAR ≥ 2:1 <br />Res ≥ 75 DU/ac or FAR ≥ 3:1 <br />Res ≥ 100 DU/ac or FAR ≥ 4:1 <br />17 TAPE certification is used in order to satisfy Special Project’s reporting requirements in the MRP. <br />TOTAL CREDIT = <br />Affordable Housing Credit - from AHCC Worksheet): <br />If the project will include non-LID treatment measures, select a treatment measure certified for “Basic” General Use Level <br />Designation (GULD) by the Washington State Department of Ecology’s Technical Assessment Protocol – Ecology (TAPE17). See <br />guidance in Appendix J of the C.3 Regulated Projects Guide (www.flowstobay.org/newdevelopment). <br />If project will implement less than 100% LID, prepare a discussion of the feasibility or infeasibility of 100% LID treatment, as <br />described in Appendix J of the C.3 Regulated Projects Guide. <br />7.A. - Page 65 of 121 <br />71 <br />0
The URL can be used to link to this page
Your browser does not support the video tag.