My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Wood Rogers Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 Wood Rogers Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 11:59:00 AM
Creation date
12/12/2025 11:58:41 AM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
12/3/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-19-25 LR <br />check and verify the accuracy of previous collected data. Priority will be <br />given to structures with missing or questionable information, as well as <br />locations where flooding has been observed or is suspected to be <br />associated with the structure. Survey efforts will include collecting data on <br />structure openings, inverts, soffits, piers, top-of-bank elevations, deck <br />elevations, and channel geometry both upstream and downstream of each <br />crossing. <br />b. Task 3.b.2 Private Creek Crossings: Subconsultant to perform up to twenty <br />(20) creek crossings on private property that were not captured as part of <br />previous modeling efforts. Consultant and team to survey structure opening, <br />invert, soffit, piers, top of banks, deck elevation, and channel geometry <br />immediately upstream and downstream of the structure. It is assumed that <br />City staff will coordinate with residents and will be able to escort <br />Subconsultant to perform surveys on private properties. <br />c. Task 3.b.3 Creek and Wetland Aerial Survey: Subconsultant to perform <br />aerial survey to capture detailed topography of the area where proposed <br />flood mitigation improvements will be located to support 30% design of City <br />preferred flood mitigation alternative. The aerial survey will supplement <br />County 1-meter LiDAR. The scope includes (1) day of aerial panel <br />placement to support capture of up to three (3) miles of continuous land <br />coverage within a 100-foot swath. This scope does not include surveying <br />ground concealed by vegetation, water, or structures. The aerial <br />topographic survey will be based on City preferred horizontal and vertical <br />datums. <br />Task 3.c Boundary Surveys: <br />a. Subconsultant to perform five (5) days of field work for finding and/or <br />establishing monuments. <br />b. Subconsultant to review title reports obtained by the City’s Project <br />Manager, and City Staff (40 hours of staff time allocated). <br />c. Subconsultant to map boundary using subdivision maps and record of <br />surveys (100 hours of staff time allocated). <br />Deliverables: Condition assessment report (PDF), Creek crossing field data <br />collection report (PDF), aerial survey (AutoCAD integrated onto design and PDF), <br />boundary surveys and memorandum (PDF), and Land, utility and topographic <br />surveys (AutoCAD integrated onto design and PDF). <br />Task 4. Flow Monitoring, up to $26,220 Time and Materials (T&M) <br />Under this task, Consultant and team will provide flow monitoring services to obtain <br />relevant data and therefore update and calibrate the Hydraulic and Hydrologic model <br />on Task 5. This task includes: <br />a.Task 4.a Install Monitors and Collect Data: <br />ATTY/AGR.2025.317/Wood Rodgers, Inc. (Page 16 of 77)
The URL can be used to link to this page
Your browser does not support the video tag.