My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 YEI Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 YEI Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2025 10:34:18 AM
Creation date
12/15/2025 10:34:10 AM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
12/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-21-25 LF <br />g.The receipt date, submittal identification number, response date, and <br />review stamp action must be logged and tracked by Consultant in an <br />electronic database maintained by Consultant. <br />h.Each submittal must be stamped with an action stamp. Consultant’s <br />action stamp must have verbiage that is identical to the review stamp <br />verbiage listed below: <br />(1) “No Exceptions Taken” <br />(2) “Make Corrections Noted” <br />(3) “Revise and Resubmit” <br />(4) “Rejected” <br />(5) “Submit Additional Information” <br />(6) “Returned Without Action” <br />7.Change Orders and Field Modifications <br />a.Consultant must prepare supporting data, Drawings, Technical <br />Specifications, and other documentation, and provide other Services as <br />needed to assist City Staff in evaluating Contractor’s proposals for <br />Change Orders and Field Modifications; <br />8.Milestone Acceptance and Project Closeout <br />a.Consultant must participate in the development of Milestone and <br />Project acceptance deficiency lists, and attend preliminary and final <br />walk-through inspections to assist City Staff in determining the final <br />completion of the Construction Work and/or designated portions of the <br />Work. <br />9.Record Documents <br />a.Based on Consultant’s site visit reviews of Contractor’s As-Built <br />documents during construction, Consultant will recommend City Staff’s <br />acceptance of Contractor’s As-Built documents prior to Consultant’s <br />preparation of the final Record Documents. <br />b.Upon City Staff’s receipt and acceptance of Contractor’s As-Built <br />documents, Consultant must prepare a reproducible set of record <br />documents for the Project including the Drawings. <br />c.Record Documents (Drawings) must also be submitted in electronic <br />format (both City Staff-specified ACAD version and PDF). <br />G.Warranty Phase <br />a.Consultant is required to arrange for and conduct an inspection of the <br />Project one month prior to expiration of the Contractor’s one-year <br />Warranty/Guarantee period. <br />PAYMENT TERMS <br />Services for each Project shall be billed on an hourly basis per the fee schedule below <br />in an amount not to exceed Six Hundred Thousand Dollars ($600,000). No additional <br />mark-up will be charged for any subconsultants. Invoices shall be billed monthly with <br />net 30 payment terms, in a form consistent with Section 6, Compensation. <br />ATTY/AGR.2025.320/YEI Engineers, Inc. (As-Needed MEP Engineering Services) (Page 23 of 26)
The URL can be used to link to this page
Your browser does not support the video tag.