My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 YEI Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 YEI Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2025 10:34:18 AM
Creation date
12/15/2025 10:34:10 AM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
12/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-21-25 LF <br />Staff must, in writing, approve any extension to the maximum response <br />times. <br />f.Consultant’s recommendations on Disputes, Claims, or other matters in <br />question between City Staff and Contractor, are subject to the <br />provisions of the Contract Documents. <br />5.Testing and Inspection Reports <br />a.Consultant must review all testing and inspection reports submitted by <br />Contractor and/or testing laboratory and any reports furnished by others <br />who may be retained or employed by City Staff to review the scope of <br />work. <br />b.Consultant must recommend to City Staff the issuance of any directives <br />that, based on Design Professionals’ evaluation of the report data, are <br />deemed necessary to obtain compliance with the requirements of the <br />Contract Documents. <br />6.Submittals <br />a.Consultant must review or take other appropriate action on receipt of <br />Contractor Submittals including but not limited to: <br />(1) Shop drawings; <br />(2) Coordination drawings; <br />(3) Product data; <br />(4) Samples; <br />(5) Substitution requests; <br />(6) Construction cost reduction proposals; <br />(7) Submittal log; <br />(8) Testing log; <br />(9) Operation and maintenance manuals; <br />(10) Warranty/guarantees; and, <br />(11) Supplier and/or vendor correspondence and related data <br />pertaining to the equipment and systems installed in the Project. <br />b.Consultant must review and return all Contractor submittals as promptly <br />as possible, but in no case shall Contractor submittals be returned later <br />than five (5) City business days from receipt of Contractor’s <br />submittals by Consultant. <br />c.Consultant must review and return unacceptable or incomplete <br />Contractor’s submittals within ten (10) City business days from receipt <br />of Contractor’s submittals by Consultant. <br />d.Consultant must notify City Staff immediately of any potential delays in <br />meeting the response times stated in this Agreement. <br />e.Consultant must immediately notify City Staff of any submittal review <br />comment that could result in a Change Order. <br />f.If Consultant makes notes on the Contractor’s Submittal that constitute <br />a change to the requirements of the scope of work, Consultant must <br />state in response to Contractor’s Submittal that a Change Order request <br />will be issued and immediately notify City Staff in writing of the need to <br />issue a Change Order request. <br />ATTY/AGR.2025.320/YEI Engineers, Inc. (As-Needed MEP Engineering Services) (Page 22 of 26)
The URL can be used to link to this page
Your browser does not support the video tag.