My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord. 2556
RedwoodCity
>
City Clerk
>
Ordinances
>
2020-2029
>
2025
>
Ord. 2556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 1:34:42 PM
Creation date
12/23/2025 1:34:37 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Meeting Type
Regular
Agency Type
City Council
Date
12/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/ORD.0014/CC ORD ENGINEERING AND TRANSPORTATION CODE UPDATES – EXHIBIT B <br />REV: 11-18-25 LR <br />Page 4 of 4 <br />Sec. 27A.38. STORMWATER TREATMENT MEASURES MAINTENANCE <br />AGREEMENTS: <br />A. The property owner(s), its administrators, successors, or any other persons, <br />including any homeowners association, of a C.3 RegulatedStormwater Treatment <br />Project shall take all necessary actions to ensure that the permanent stormwater <br />pollution prevention measures (“PSPPM”) are properly maintained so that they <br />continue to operate as originally designed and approved. The maintenance of the <br />control measures shall be in accordance with the terms and conditions of a <br />maintenance agreement and shall be in the form of a covenant running with the <br />land, environmental mitigation measures, a use permit, enforceable conditions of <br />approval, or other legal agreement. The agreement shall provide access to the <br />extent allowable by law for representatives or agents of City for the purpose of <br />verification of property operation and maintenance of the specific PSPPM. The <br />agreement must be signed by the City Clerk and shall be recorded in the office of <br />the County Recorder, shall remain in force until ownership of the developed <br />property has been transferred, and upon transfer, shall be binding on the new <br />owner(s). <br />B. Any property owner that has been required by this Chapter to construct or install <br />and maintain PSPPM shall upon transferring ownership of such property provide <br />the new owners with a current copy of this Chapter, and shall inform the new <br />owners in writing of their obligation to properly operate and maintain such PSPPM. <br />C. It shall be unlawful to alter, modify or change any components of the PSPPM <br />without first obtaining the written certification of the City Engineer that the <br />requirements of this Chapter have been satisfied.
The URL can be used to link to this page
Your browser does not support the video tag.