My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 BKF Engineers -Sanitary Sewer Capacity Improvements Project
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 BKF Engineers -Sanitary Sewer Capacity Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 4:34:42 PM
Creation date
12/23/2025 3:16:11 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Sanitary Sewer Capacity Improvements Project
RMP File Number
304
Date
12/19/2025
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-14-25 LR <br />EXHIBIT “A” <br />SCOPE OF SERVICES AND FEE <br />This scope of services details Consultant’s work plan for the design and construction <br />administration of the 2025 – 2026 Sanitary Sewer Capacity Improvement Project. Figure <br />1 and Table 1 below include project locations and site information for reference. <br />Figure 1. 2025 – 2026 Sanitary Sewer Capacity Improvement Project Map <br />Table 1. 2025 – 2026 Sanitary Sewer Capacity Improvement Project Location <br />Project ID Street <br />Name <br />From <br />(MH #) <br />To <br />(MH #) <br />Approx. <br />Length <br />(Linear Feet) <br />Existing <br />Diameter <br />(Inches) <br />Proposed <br />Diameter <br />(Inches) <br />Beech St. 1148 1129 1,059 27 36 <br />Stambaugh <br />St. <br />1129 2645 829 27 36C3 <br />Walnut St. 2645 3047 1,420 27 36 <br />C12 Vera Ave. 4142 4136 965 8 12 <br />Lincoln Ave. 4125 1163 2,059 24 30C13Lincoln Ave. 1163 1178 445 24 33 <br />ATTY/AGR.2025.306/BKF Engineers (Agreement for Service with BKF Engineers) (Page 11 of 19)
The URL can be used to link to this page
Your browser does not support the video tag.