Laserfiche WebLink
REV: 11-14-25 LR <br />Deliverables: <br />Summarize and state hydraulic modeling results in the Basis of Design Report <br />List of Key Personnel <br />Primary Contact: Adam Brown, PE, Project Manager, BKF Engineers <br />Secondary Contact: Sravan Paladugu, PE, CFM, QSD/P, Vice President/Principal-in- <br />Charge, BKF Engineers <br />Subconsultants: <br />Rockridge Geotechnical <br />D&M Utility Services of CA <br />Proposed Project Schedule <br />The proposed project schedule is included in Attachment A – BKF Engineers Proposal <br />Schedule. The schedule will be adjusted based on the actual NTP. <br />Fees <br />The City will pay to the Consultant a not-to-exceed amount of Six Hundred Eighteen <br />Thousand Two Hundred Twenty-Seven Dollars ($618,227) to perform the Scope of <br />Services as described in Exhibit “A”. The fees allocated to each task may be transferred <br />among each work element/task at the discretion of the City Engineer or their designee <br />depending on specific interim work needs, but the total cost to the City shall not exceed <br />the amount of $618,227. <br />ATTY/AGR.2025.306/BKF Engineers (Agreement for Service with BKF Engineers) (Page 19 of 19)