My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 BKF Engineers -Sanitary Sewer Capacity Improvements Project
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 BKF Engineers -Sanitary Sewer Capacity Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 4:34:42 PM
Creation date
12/23/2025 3:16:11 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Sanitary Sewer Capacity Improvements Project
RMP File Number
304
Date
12/19/2025
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-14-25 LR <br />Deliverables: <br />Summarize and state hydraulic modeling results in the Basis of Design Report <br />List of Key Personnel <br />Primary Contact: Adam Brown, PE, Project Manager, BKF Engineers <br />Secondary Contact: Sravan Paladugu, PE, CFM, QSD/P, Vice President/Principal-in- <br />Charge, BKF Engineers <br />Subconsultants: <br />Rockridge Geotechnical <br />D&M Utility Services of CA <br />Proposed Project Schedule <br />The proposed project schedule is included in Attachment A – BKF Engineers Proposal <br />Schedule. The schedule will be adjusted based on the actual NTP. <br />Fees <br />The City will pay to the Consultant a not-to-exceed amount of Six Hundred Eighteen <br />Thousand Two Hundred Twenty-Seven Dollars ($618,227) to perform the Scope of <br />Services as described in Exhibit “A”. The fees allocated to each task may be transferred <br />among each work element/task at the discretion of the City Engineer or their designee <br />depending on specific interim work needs, but the total cost to the City shall not exceed <br />the amount of $618,227. <br />ATTY/AGR.2025.306/BKF Engineers (Agreement for Service with BKF Engineers) (Page 19 of 19)
The URL can be used to link to this page
Your browser does not support the video tag.