Laserfiche WebLink
ATTY/RESO.0024/PC RESO 901 EL CAMINO <br />REV: 04-11-25 VR <br />Page 7 of 20 <br />a. The Project General Plan Mixed-Use Downtown Amendments to increase the <br />DTPP Maximum Allowable Development office cap are consistent with the <br />goals and policies of the General Plan (as amended) including but not limited <br />to the General Plan goals, policies and programs listed in the Staff Report <br />prepared for the Project: BC 3.1, BE-1.4, BE-1.7, BE-11.5, BE-11.6, BE-12.1, <br />BE-12.2, BE-12.4, BE-12.5, BE-12.6, BE-18.2, BE–11.6, BE-18.2, BE-18.5, <br />BE-18.7, BE-18.9, BE-23.7, and H-2.3. The Mixed-Use Downtown <br />Amendments appropriately implement the General Plan’s vision for the Mixed <br />Use–Downtown land use designation as the approved DTPP Plan Wide <br />Amendments allow increases to the office development cap. <br /> <br />b. The Project General Plan Mixed-Use Downtown Amendments are limited to an <br />increase in the allowed office development cap and will not create conditions <br />that would be detrimental to the public health, safety, or general welfare. These <br />amendments would instead enhance the DTPP area by promoting planned, <br />transit-oriented development, including increased office with R&D, Lab uses, a <br />Teen Center/Multi-Purpose space, and a public open space plaza consistent <br />with General Plan goals and policies. The Project will revise the General Plan <br />and DTPP Maximum Allowable Development office cap consistent with the <br />amount of office development previously analyzed by the DTPP SEIR. <br />Section 5.Downtown Precise Plan Amendment Findings. Based on the facts <br />and evidence in the Record, the Planning Commission, in the exercise of its independent <br />judgement, finds: <br /> <br />a. The Project DTPP Maximum Allowable Development (MAD) Amendments are <br />consistent with the goals and policies of the DTPP (as amended), the <br />prescribed process for increasing the MAD, and appropriately implements the <br />DTPP’s vision for the land use designations in the DTPP as a mixed-use office <br />development is permitted in this area of the DTPP, and R&D Lab uses are <br />conditionally permitted. The Amendments will allow a Project that meets all <br />DTPP Standards and Guidelines, subject to Standards exceptions that the <br />project is eligible for and Guideline deviations that were found appropriate to <br />the building design. <br />In addition, increasing the office capacity in the DTPP for this project would <br />allow for a new mixed-use development on the El Camino Corridor replacing <br />underutilized auto-oriented commercial uses and parking. The project would <br />create additional jobs in Redwood City’s downtown contributing to making the <br />downtown the premier urban location for business, dining, living, and <br />entertainment. The project would also further strengthen pedestrian, transit and <br />bicycle connections by improving the pedestrian experience with streetscape <br />improvements and open space, providing new bike lanes, and be located within <br />walking distance of high quality transit. <br />