Laserfiche WebLink
ATTY/RESO.0090/PC RESO 1201 MAIN STREET MIXED USE PROJECT <br />REV: 08-15-25 VR <br />Page 14 of 32 <br /># DEVELOPMENT FEE Conditions – Fees listed below are estimates. Rates in effect at building permit issuance will <br />apply unless otherwise noted. See Master Fee Schedule for details. <br />Compliance <br />D11 Notice of Fees Protest. Protests of any fees, dedications, reservations, or other exactions imposed by the City as <br />part of the approval or as a condition of approval of the project pursuant to California Government Code Section <br />66020 and shall be filed within 90-days from the date of the project approval. [OFFICE OF THE CITY ATTORNEY][SDR] <br />90-days from Project <br />Approval <br /> <br /># BUILDING Conditions Compliance <br />B1 Low-Emitting & Carpool Parking. Designate at least 10 parking spaces for any combination of low-emitting, fuel- <br />efficient and carpool/vanpool vehicles. [Section 30.4.G of Zoning Code][SDR] <br />Prior to Building Permit <br />Issuance <br />B2 Electric Vehicle Charging Stations. Provide and install electric vehicle charging spaces, pre-wired electrical vehicle <br />stalls, and stalls with EV conduit, with the appropriate number of accessible spaces with at least one being van <br />accessible, including considerations for signage and time limits. Compliance shall be demonstrated with the <br />California Green Building Standards Code applicable at the time of building permit application. [COA] <br />Prior to Building Permit <br />Issuance <br />B2 Verification of Dimensions. Provide a survey report, prepared by a licensed surveyor, verifying site building location, <br />setbacks, and building height, if applicable, to the Building Division for review and approval prior to permit issuance. <br />Survey report shall be kept on the project site throughout the course of construction and be made available to the <br />Building Inspector for all foundation forms and footings inspections. [Section 9.40 of Municipal Code][SDR] <br />Prior to Building Permit <br />Issuance and again <br />prior to Foundation <br />Framing Inspection <br />B3 <br />Sales and Use Taxes. Register with the Board of Equalization to create an ID prior to maximize the City’s <br />allocation of sales and use taxes associated with project construction. Contact the Finance Department at (650) <br />780-7213 [City Revenue Manager] to coordinate on this process and requirements. [Guidance Brochure][COA] <br />Prior to Building Permit <br />Issuance or <br />Commencement of <br />Operations if no <br />Building Permit is <br />Required <br />B4 Hours of Construction. Construction activity is permitted between 7:00 a.m. and 8:00 p.m., Monday through Friday, <br />except as permitted on weekends by the Building Official, and in accordance with the City’s Noise Ordinance. <br />Schedule noisiest construction activities, as identified under Section 24.30, on weekdays from 9:00 a.m. to 4:00 <br />p.m. when ambient noise levels are the highest. [Section 24.32 of Municipal Code][SDR] <br />During Construction <br />B5 Construction Sign. Install and provide photo verification of at least one 36” x 48” (minimum) construction sign in a <br />visible location along the project frontage for the duration of construction. The sign shall include, at minimum, the <br />following information: project name & address, elevation or rendering, construction manager (name, phone <br />Prior to Building Permit <br />Issuance