Laserfiche WebLink
ATTY/RESO.0090/PC RESO 1201 MAIN STREET MIXED USE PROJECT <br />REV: 08-15-25 VR <br />Page 15 of 32 <br /># BUILDING Conditions Compliance <br />number), anticipated completion (season, year), and the City’s permitting website http://permits.redwoodcity.org. <br />[COA] <br />B6 Fencing. Install temporary construction fence around the perimeter of the site that provides for continued <br />pedestrian traffic meeting the standards of the Americans with Disabilities Act as approved by the Building Official. <br />Contain all construction debris in an approved debris box at all times and discard in accordance with Recology <br />standards. [COA] <br />Prior to Building Permit <br />Issuance <br />B7 Pre-Construction Meeting. Schedule a pre-construction meeting with the Building Official or Designee to discuss <br />the inspection process and requirements for construction and site work. The City will arrange attendance from the <br />associated divisions including Engineering, Fire, Planning, Housing, and other divisions as applicable. The Applicant <br />shall arrange for the attendance of the owner, developer, construction manager, contractor, and all subcontractors <br />who are responsible for grading and erosion and sedimentation protection controls. [COA] <br />Prior to Building Permit <br />Issuance <br />B8 Minor Modifications. Modifications to the approved plans require Planning review and approval prior to building <br />permit issuance. Minor project modifications required to meet building, fire, and safety codes at time of building <br />permit plan check may be allowed, at the City’s discretion. Substantial modification of approved plans, as <br />determined by the Zoning Administrator, may be subject to an amendment or a new Permit. [COA] <br />Prior to Building Permit <br />Issuance <br />B9 Exterior Wall Finish. Type III construction is that type of construction in which the exterior walls are of <br />noncombustible materials per CBC 602.3. The exterior wall finish shall be noncombustible or shall comply with CBC <br />1405. [COA] <br />Prior to Building Permit <br />Issuance <br /> <br /># ENGINEERING & TRANSPORTATION Conditions Compliance <br />E1 <br />E2 Parcel Map. Obtain approval and record a Parcel Map. The Parcel Maps shall include the lot configuration and <br />proposed easements and conform to the Subdivision Map Act and Chapter 30 of the Municipal Code. [Section 30.28 <br />of Municipal Code][SDR] <br />Prior to Building <br />Permit Issuance <br />E3 Landscape Maintenance Agreement. Enter into a Landscape Maintenance Agreement for all assigned landscape <br />areas in public rights of way, easements, and/or on property in which the City holds a maintenance interest. <br />Maintenance items shall include planted trees, shrubs, flowers, grass, and all appurtenances including irrigation <br />systems and pedestrian scale lighting. Tree Permits are required for street tree pruning. The agreement shall be in a <br />Prior to Parcel Map <br />approval