ATTY/RESO.0090/PC RESO 1201 MAIN STREET MIXED USE PROJECT <br />REV: 08-15-25 VR <br />Page 16 of 32 <br /># ENGINEERING & TRANSPORTATION Conditions Compliance <br />form acceptable to the City Attorney and the Engineering & Transportation Director. [Section 29.4C of Municipal <br />Code][SDR] <br />E4 Stormwater Treatment Measures Maintenance Agreement. Enter into a Stormwater Treatment Measures <br />Maintenance Agreement for all on-site stormwater treatment measures associated with the project. The agreement <br />shall be in a form acceptable to the City Attorney and the Engineering & Transportation Director. [Section 27A.38 of <br />Municipal Code][SDR] <br />Prior to Parcel Map <br />approval <br />E5 Subdivision Improvement Agreement. Enter into an Improvement Agreement to guarantee the installation of all <br />improvements required of the project and to provide for payment of all City inspection and plan check charges <br />associated with the installation of public and private improvements, including, but not limited to, streets, sanitary <br />sewers, water, storm drains and streetlights. The agreement shall be in a form acceptable to the City Attorney and <br />the Engineering & Transportation Director. [Section 30.53 / Section 29.95 of Municipal Code][SDR] <br />Prior to Parcel Map <br />approval <br />E7 Bicycle Parking. At a minimum designate 18 long-term and 8 short-term bicycle storage spaces for office use and <br />designate 28 long-term and 6 short-term bicycle storage spaces for residential use in accordance with the approved <br />plans. The number of required short-term and long-term bicycle storage spaces shall comply with the California Green <br />Building Standards Code applicable at the time of building permit application [SDR] <br />Prior to Building <br />Permit Issuance <br />E8 Shared Parking Covenant. Enter into a Shared Parking Covenant providing the City with assurance that the shared <br />parking obligations will be met and, if applicable, the valet parking service will be provided for the life of the project. <br />Record the shared parking covenant against the property concurrent with the Parcel Map or prior to issuance of a <br />building permit if there is no map. The agreements shall be in a form acceptable to the City Attorney and the <br />Engineering & Transportation Director. [COA] <br />Building Permit <br />Issuance <br />E9 Transportation Demand Management Plan. Submit a final Transportation Demand Management (TDM) plan for <br />approval by the City’s TDM Manager and provide a written description of how the plan will be implemented. <br />Complete C/CAG’s TDM checklist to participate in the Commute.org Development Certificate Program, as determined <br />by the Engineering & Transportation Director. [Section 48.5 of Municipal Code][SDR] <br />Prior to Certificate of <br />Occupancy <br />E10 Transportation Demand Management Implementation. The TDM plan referenced above shall include an annual <br />reporting requirement for the life of the project. Submit reports by January 31 of each year to the City’s TDM <br />Manager. Failure to comply with annual implementation requirements may result in enforcement action. Include <br />data on public parking usage within the annual TDM report. [Section 48.8 of Municipal Code][SDR] <br />Ongoing