Laserfiche WebLink
ATTY/RESO.0090/PC RESO 1201 MAIN STREET MIXED USE PROJECT <br />REV: 08-15-25 VR <br />Page 7 of 32 <br />b. That the proposed use is compatible with surrounding uses. <br />The proposed office development is compatible with surrounding uses which <br />include a mixture of commercial, industrial, quasi-public (Church) and residential <br />uses. In addition, the project site is adjacent to the boundaries of Redwood City’s <br />downtown which is an urban, dense environment with a mixture of different uses. <br />A mixed-use project of the size and scale proposed would thus be compatible with <br />a transitional urban mixed-use zone. <br /> <br />c. That the use and its associated structures and facilities will not be <br />detrimental to the public health, safety, or welfare of the people and property <br />of Redwood City. <br />The proposed office will not be detrimental to the public health, safety, or welfare of <br />the people of Redwood City because the use would take place indoors and is not <br />associated with noise, odors, or hazardous materials. <br /> <br />d. That the use and facilities will not adversely affect or conflict with <br />adjacent uses or impede the normal development of surrounding property. <br />The development and use will not adversely affect or conflict adjacent uses or <br />impede normal development of surrounding properties. The project meets all <br />required development standards and is located directly adjacent to Redwood City’s <br />downtown area. The proposed office and residential uses are compatible with and <br />would complement the surrounding commercial and residential uses. <br /> <br />e. That adequate public and private facilities such as utilities, <br />landscaping, parking spaces, and traffic circulation measures are or will be <br />provided for the proposed use. <br />The proposed project would include numerous infrastructure, utility, and <br />landscaping upgrades including new street trees, crosswalks, pedestrian safety <br />improvements, and stormwater treatment, as well as curb ramp improvements at <br />the corner of Chestnut and Heller Street as a community benefit. <br /> <br />The project also includes two levels of underground parking to meet the desired <br />needs for the use. In addition, the project is within a half mile of the Caltrain station, <br />provides bicycle parking on-site, and has submitted a Transportation Demand <br />Management plan to reduce single-occupancy vehicle trips. <br /> <br />f. Other findings required to be made in specific zoning districts as set <br />forth in the Zoning Ordinance. <br />None <br /> <br />6. Tentative Parcel Map (TM2024-001). Pursuant to Municipal Code section <br />30.19 and Subdivision Map Act, the Planning Commission finds that none of the following <br />findings requiring or supporting denial of the Vesting Tentative Map Application apply to <br />the Project: <br /> <br />