My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25-12 0126 PC Reso 1320 Marshall Street Project
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2025
>
Reso25-12 0126 PC Reso 1320 Marshall Street Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 3:54:13 PM
Creation date
1/6/2026 3:54:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
12/16/2025
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
1/6/2026 3:54 PM
Modified:
1/6/2026 3:54 PM
Text:
https://www.redwoodcity.org/home/showpublisheddocument/28700/638575180611100000
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
1/6/2026 3:54 PM
Modified:
1/6/2026 3:54 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH9BU_ARTIVAD2022STCO_S9.40AD2022STCOLOAM
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
1/6/2026 3:54 PM
Modified:
1/6/2026 3:54 PM
Text:
https://cdtfa.ca.gov/taxes-and-fees/local-jur-statement.aspx
ID:
4
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
1/6/2026 3:54 PM
Modified:
1/6/2026 3:54 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH24NORE_ARTIIEXUNNO_DIV3CO_S24.30EXUNNO
ID:
5
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
1/6/2026 3:54 PM
Modified:
1/6/2026 3:54 PM
Text:
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Flibrary.municode.com%2Fca%2Fredwood_city%2Fcodes%2Fcity_code%3FnodeId%3DCH24NORE_ARTIIEXUNNO_DIV3CO&data=05%7C02%7Cshughes%40redwoodcity.org%7Cc1af7723a04a403a505e08dca2b58c87%7C02eee40d6a354d7588035403096cc23e%7C0%7C0%7C638564147858641087%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=JFrbTlZ4b3%2FIZaqC15uKZQB8v0M1xsJ4U40zK7EiF98%3D&reserved=0
ID:
6
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
1/6/2026 3:54 PM
Modified:
1/6/2026 3:54 PM
Text:
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Flibrary.municode.com%2Fca%2Fredwood_city%2Fcodes%2Fcity_code%3FnodeId%3DCH24NORE_ARTIIEXUNNO_DIV3CO&data=05%7C02%7Cshughes%40redwoodcity.org%7Cc1af7723a04a403a505e08dca2b58c87%7C02eee40d6a354d7588035403096cc23e%7C0%7C0%7C638564147858641087%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=JFrbTlZ4b3%2FIZaqC15uKZQB8v0M1xsJ4U40zK7EiF98%3D&reserved=0
ID:
7
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
1/6/2026 3:54 PM
Modified:
1/6/2026 3:54 PM
Text:
https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fpermits.redwoodcity.org%2F&data=05%7C02%7Cshughes%40redwoodcity.org%7Cc1af7723a04a403a505e08dca2b58c87%7C02eee40d6a354d7588035403096cc23e%7C0%7C0%7C638564147858649067%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=n1JN7YawU5n9%2Fgjm6q4fMOZJARBB03WIze%2FqHiJ7iII%3D&reserved=0
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0126/PC RESO 1320 MARSHALL STREET PROJECT – EXHIBIT A <br />REV: 12-10-25 VR <br />Page 3 of 13 <br /># DEVELOPMENT FEE Conditions – Fees listed below are estimates. Rates in effect at the time the SB330 preliminary <br />application was submitted will apply unless otherwise noted. See Master Fee Schedule for details. Compliance timing shall <br />be as noted unless otherwise changed by SB937 or State Law. <br />Compliance <br />D8 Notice of Fees Protest. Protests of any fees, dedications, reservations, or other exactions imposed by the City as part of the <br />approval or as a condition of approval of the project pursuant to California Government Code Section 66020 and shall be filed <br />within 90-days from the date of the project approval. [OFFICE OF THE CITY ATTORNEY][SDR] <br />90-days from Project <br />Approval <br /> <br /># BUILDING Conditions Compliance <br />B1 Verification of Dimensions. Provide a survey report, prepared by a licensed surveyor, verifying site building location, setbacks, <br />and building height, if applicable, to the Building Division for review and approval prior to permit issuance. Survey report shall <br />be kept on the project site throughout the course of construction and be made available to the Building Inspector for all <br />foundation forms and footings inspections. [Section 9.40 of Municipal Code][SDR] <br />Prior to Building Permit <br />Issuance and again prior <br />to Foundation Framing <br />Inspection <br />B2 Sales and Use Taxes. Register with the Board of Equalization to create an ID prior to maximize the City’s allocation of sales <br />and use taxes associated with project construction. Contact the City Revenue Manager at (650) 780-7213 to coordinate on <br />this process and requirements. [Guidance Brochure][COA] <br />Prior to Building Permit <br />Issuance <br />B3 Hours of Construction. Construction activity is permitted between 7:00 a.m. and 8:00 p.m., Monday through Friday, except <br />as permitted on weekends by the Building Official, and in accordance with the City’s Noise Ordinance and standard <br />construction noise controls in General Plan Program PS-63. Schedule noisiest construction activities, as identified under <br />Section 24.30, on weekdays from 9:00 a.m. to 4:00 p.m. when ambient noise levels are the highest. [Section 24.32 of Municipal <br />Code][SDR] <br />During Construction <br />B4 Construction Sign. Install and provide photo verification of at least one 36” x 48” (minimum) construction sign in a visible <br />location along the project frontage for the duration of construction. The sign shall include, at minimum, the following <br />information: project name & address, elevation or rendering, construction manager (name, phone number), anticipated <br />completion (season, year), and the City’s permitting website http://permits.redwoodcity.org. [COA] <br />Prior to Building Permit <br />Issuance <br />B5 Fencing. Install temporary construction fence around the perimeter of the site that provides for continued pedestrian traffic <br />meeting the standards of the Americans with Disabilities Act as approved by the Building Official. Contain all construction <br />debris in an approved debris box at all times and discard in accordance with Recology standards. [COA] <br />Prior to Building Permit <br />Issuance <br />B6 Pre-Construction Meeting. Schedule a pre-construction meeting with the Building Official or Designee to discuss the <br />inspection process and requirements for construction and site work. The City will arrange attendance from the associated <br />divisions including Engineering, Fire, Planning, Housing, and other divisions as applicable. The Applicant shall arrange for the <br />attendance of the owner, developer, construction manager, contractor, and all subcontractors who are responsible for grading <br />and erosion and sedimentation protection controls. [COA] <br />Prior to Building Permit <br />Issuance <br />B7 Changes to Meet Code. Modifications to the approved plans require Planning review and approval prior to building permit <br />issuance. Minor project modifications required to meet building, fire, and safety codes at time of building permit plan check <br />Prior to Building Permit <br />Issuance
The URL can be used to link to this page
Your browser does not support the video tag.