My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25-12 0126 PC Reso 1320 Marshall Street Project
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2025
>
Reso25-12 0126 PC Reso 1320 Marshall Street Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 3:54:13 PM
Creation date
1/6/2026 3:54:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
12/16/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0126/PC RESO 1320 MARSHALL STREET PROJECT <br />REV: 12-10-25 VR <br />Page 5 of 7 <br />lot’s width and all other large expanses of paved areas are interior of the site and <br />screened by proposed buildings and landscaping. <br /> <br />H. In the case of any commercial or industrial structure, the review <br />authority shall consider its proximity to any R District and shall consider the <br />effect of the proposed structure upon the character and value of the adjacent <br />R District area. <br /> <br />This finding is not applicable to this project, as the project is a residential <br />development. <br /> <br />I. The provision of permeable areas and drainage design appropriate to <br />capture and treat stormwater runoff prior to its discharge from the site <br />including, but not limited to, the use of vegetated swales, landscape <br />features, permeable pavement materials, infiltration basins or engineered <br />designs. <br /> <br />The project complies with all applicable pervious area requirements for the and all <br />applicable engineering and storm water management standards including, but not <br />limited to, onsite treatment of runoff as it proposes an increase of permeable area, <br />from 2,770 square feet to 9,275 square feet, in the form of open space landscaping, <br />in addition to onsite and offsite infiltration systems such as bioretention areas and <br />silva cells. <br /> <br />Section 5. Tentative Map (TM2025-001) – The Planning Commission finds that: <br /> <br />A. The proposed map is consistent with the general plan, any applicable <br />specific plan, any policy or guideline implementing the general plan, the <br />Zoning Code, and all other applicable provisions of the Municipal Code. <br /> <br />The map of the proposed subdivision is consistent with Redwood City’s General <br />Plan density and purpose and all applicable standards from the Zoning Ordinance <br />and all applicable subdivision improvement requirements as allowed by State <br />Density Bonus Law. <br /> <br />B. The site is physically suitable for the proposed type and density of <br />development. <br /> <br />The site is suitable for the proposed project as it is a residential multi-family <br />development which does not exceed the maximum density allowed based on its <br />General Plan designation. <br /> <br />C. The design of the subdivision or the proposed improvements will not <br />cause substantial environmental damage or substantially and avoidably <br />injure fish or wildlife or their habitat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.